Virginia DRPT is beginning the second tier of a high-speed rail study for the D.C. to Richmond corridor.
Rail to Richmond Survey Available, Public Meetings Scheduled
read more
;
Virginia DRPT is beginning the second tier of a high-speed rail study for the D.C. to Richmond corridor.
Virginia’s Department of Rail and Public Transportation is evaluating which proposed route through the Fredericksburg area is most feasible.
Residents voiced concerns about the possibility of a Fredericksburg bypass being built through their neighborhood or on their property.
Construction of a spur line near the Fredericksburg Fairgrounds is expected to be completed by December 2016.
Meetings will be held in Fredericksburg, Springfield and Richmond December 8 – 10, 2015