;

Area road work this week

by | Dec 18, 2023 | Traffic

I-95 Northbound and Southbound

Exit 140 (Courthouse Road) to Exit 143 (Aquia/Garrisonville)

Sunday – Thursday, 9 p.m. – 4:30 a.m. Alternating northbound and southbound lane closures at mile marker 140 for maintenance at Courthouse Road interchange area bridges.

Exit 118 (Thornburg) to Exit 126 (Spotsylvania)

Sunday, 4 a.m. – 8 a.m. All northbound and southbound traffic will be slow-rolled or stopped briefly at mile markers 124-125 to move utility lines across the interstate travel lanes.

I-95 Northbound

Exit 133 (Falmouth/Warrenton)

Monday, 9:30 a.m. – 3:30 p.m. Single lane closure at mile marker 133 for the 95 Express Lanes Fredericksburg Extension project.

Exit 140 (Courthouse Road) to Exit 148 (Quantico)

Monday – Friday, 9 p.m. – 4:30 a.m. Single lane closure at mile markers 140-142 and 145-147 for the 95 Express Lanes Fredericksburg Extension project.

I-95 Southbound

Exit 148 (Quantico) to Exit 143 (Aquia/Garrisonville)

Thursday, 9 p.m. – 10 a.m. Single lane closure at 9 p.m. and double at 10 p.m. at mile markers 148-145 for pavement markings. Part of 95 Express Lanes Fredericksburg Extension project construction.

Exit 148 (Quantico) to Exit 133 (Falmouth/Warrenton)

Monday – Wednesday, 9 p.m. – 10 a.m. Single lane closure at mile markers 146-144 and 135-133 for work zone barrier removal. Part of 95 Express Lanes Fredericksburg Extension project construction.

Exit 143 (Aquia/Garrisonville) to Exit 133 (Falmouth/Warrenton)

Tuesday, 9:30 a.m. – 3:30 p.m. Single lane closure at mile markers 143-140 and 136-134 for the 95 Express Lanes Fredericksburg Extension project.

Stafford County

Route 3 (Kings Highway) and Blue and Gray Parkway

Monday – Thursday, 8 a.m. – 4 p.m. Single lane closure for traffic signal repair.

Route 17 Northbound and Southbound

Tuesday, 7 a.m. – 7 p.m. and Tuesday – Thursday, 9 p.m. – 5 a.m. Alternating northbound and southbound lane closures on Route 17 for maintenance to the bridge over Deep Run.

Route 606 (Ferry Road)

Tuesday – Thursday, 9 a.m. – 2:15 p.m. and Friday, 9 a.m. – Noon. Alternating lane closures with flagging between Route 3 (Kings Highway) and Route 1161 (Town and County Road) for permit/utility work.

Spotsylvania County

Route 1 Northbound and Southbound at Route 606

Monday – Friday, 7 p.m. – 3 a.m. Alternating single lane closures on Route 1 near the Morris Road/Mudd Tavern Road intersection for traffic signal repair.

Route 1 Southbound

Monday – Wednesday, 9 a.m. – 3:30 p.m. Single lane closure for permit work between Route 632 (Hickory Ridge Road) and Route 1462 (Larkin Chew Road).

Gordon Road Northbound

Wednesday – Thursday, 9 a.m. – 3:30 p.m. Flagging operation for pavement work between Green Arbor Drive and Harrison Road. Flagging crew will direct drivers through the work zone.

Paving

Monday – Friday, Alternating lane closures for paving for the traffic shift on Route 606 (Mudd Tavern Road) as construction progresses on the widening project. Read the release here. Flagging crews will direct traffic along the following routes:

Route 606 between I-95 and Taverneer Lane

Route 1 between Roxbury Mill Road and South of the shopping mall entrance

Caroline County

Route 1 Northbound and Southbound at Route 639

Monday – Friday, 8 a.m. – 5 p.m. Single lane and shoulder closures on Route 1 near the Ladysmith Road intersection. Final construction activities as part of the Ladysmith Road widening project.

Route 603 (County Line Church Road)

Monday – Friday, 8 a.m. – 4 p.m. Alternating lane closure between Route 632 (Quarter Road) and Route 661 (Doc Stone Road) for permit work.

Essex County

Mobile Pavement Markings

Monday – Thursday, 7 a.m. – 5 p.m. Mobile lane closures for sign installation and pavement markings. A flagging crew will direct drivers through the following routes:

Route 615 (Mussel Swamp Road) and Route 726 (Deep Landing Road)

Route 622 (Faucetts Road) and Route 621 (Midway Road)

Route 627 (Mount Landing Road) and Route 618 (Scotts Mill Road)

Route 627 (Mount Landing Road) and Route 628 (Fernlea Road)

Route 637 (Hustle Road) and Route 639 (Laurel Springs Road)

Route 684 (Howerton Road) and Route 611 (Johnville Road)

Gloucester County

Pavement Markings

Monday – Friday, 9 a.m. – 3:30 p.m. Mobile lane closures with flagging for pavement marking work along the following routes:

Route 17 northbound between Route 1307 and Route 610 (Davenport Road)

Route 17 southbound near Coleman Bridge

Royte 17 southbound between Route 1301 (Fields Landing Road) and Middlesex County line

Mobile Pavement Markings

Monday – Thursday, 7 a.m. – 5 p.m. Mobile lane closures for pavement markings and/or sign installation. A flagging crew will direct drivers through the following intersections:

Route 605 and Route 1442 (Beasley Drive)

Route 606 (Ark Road) and Route 615 (E. Chestnut Fork Road)

Route 606 (Farys Mill Road) and Route 1110 (Forest Grove Drive)

Route 610 and Route 612 (Millers Landing Road)

Route 610 (Pinetta Road) and Route 610 (Davenport Road)

Route 614 (Hickory Fork Road) and Route 618 (Cappahosic Road)

Route 618 (Cappahosic Road) and Route 1342 (Poplar Pond Drive)

Route 623 and Route 624 (Griffin Road)

Route 628 and Route 629 (Paige Road)

Route 629 (T.C. Walker Road) and Route 626 (Zanoni Road)

Route 629 and Route 671 (Enfield Road) and Route 728 (Goshen Lane)

Route 632 and Route 1355 (Thompson Road)

Route 632 (Aberdeen Creek Road) and Route 1380 (Carters Cove Drive)

Route 652 (Guinea Circle) and Route 651 (Browns Bay Road)

Route 1405 (Kitchener Drive) and Route 1422 (Founders Mill Way)

King George County

Pavement Markings

Monday – Thursday, 9 a.m. – 3:30 p.m. Mobile lane closures with flagging for pavement marking work along the following routes:

Route 218 between Stafford County line and Indiantown Road

Route 206 between Route 3 and Route 301

Pavement Markings

Monday – Thursday, 7 a.m. – 5 p.m. Mobile lane closures with flagging for pavement marking work at the following intersections:

Route 3 with Route 610 (Indiantown Road)

Route 3 with Route 609 (Comorn Road)

King and Queen County

Mobile Pavement Markings

Monday – Thursday, 7 a.m. – 5 p.m. Mobile lane closures for sign installation and pavement markings. A flagging crew will direct drivers through the following intersections:

Route 610 (Coldwater Road) and Route 613 (Dabney Road)

Route 628 (Spring Cottage Road) and Route 625 (Poplar Hill Road)

Route 629 (Walkerton Landing Road) and Route 633 (Rose Mount Road)

Route 631 (Poorhouse Road) and Route 617 (Providence Road)

Route 634 (Canterbury Road) and Route 633 (Rose Mount Road)

Route 635 (Bradley Farm Road) and Route 633 (Indian Neck Road)

Route 635 (Elevon Road) and Route 627 (Mt. Landing Road)

Route 721 (Newton Road) and Route 660 (Sorghum Road)

Route 721 (Newton Road) and Route 652 (Vessels Road)

Route 721 (Newton Road) and Route 640 (Lyneville Road)

King William County

Mobile Pavement Markings

Monday – Thursday, 7 a.m. – 5 p.m. Mobile lane closures for sign installation and pavement markings. A flagging crew will direct drivers through the following intersections:

Route 600 (W. River Road) and Route 603 (Dover Lane)

Route 606 (Commins Road) and Route 1216 (Newman Drive)

Route 608 (Upshaw Road) and Route 1135 (Parkwood Drive)

Lancaster County

Mobile Pavement Markings

Monday – Thursday, 7 a.m. – 5 p.m. Mobile lane closures for sign installation and pavement marking. A flagging crew will direct drivers through the following intersections:

Route 600 and Route 617 (Alfonso Road)

Route 604 and Route 684 (Richtown Road)

Route 614 and Route 673 (Riverside Drive)

Route 622 and Route 751 (Creekside Drive)

Route 646 and Route 670 (Ring Farm Road)

Mathews County

Mobile Pavement Markings

Monday – Thursday, 7 a.m. – 5 p.m. Mobile lane closures for pavement marking and sign installations at various intersections on secondary routes in Mathews County. A flagging crew will direct drivers through the following intersections:

  • Route 600 (Circle Drive) and Route 655 (Dutchman’s Road)
  • Route 617 (N. River Road) and Route 654 (Gum Springs Road)
  • Route 625 (Tie Neck Road) and Route 660 (E. River Road)
  • Route 643 (Haven Beach Road) and Route 613 (Knight Wood Road)

Middlesex County

Mobile Pavement Markings

Monday – Thursday, 7 a.m. – 7 p.m. Mobile lane closures for pavement markings. A flagging crew will direct drivers through the following intersections:

  • Route 623 (Regent Road) and Route 622 (Dirt Bridge Road)
  • Route 603 and Route 607 (Guinea Station Road)

Northumberland County

Mobile Pavement Markings

Monday – Thursday, 7 a.m. – 5 p.m. Mobile lane closures for sign installation and pavement marking. A flagging crew will direct drivers through the following intersections:

Route 600 and Route 616 (Luttrellville Lane)

Route 608 and Route 1205 (Clifton Landing Road)

Route 615 and Route 610 (Light Street)

Route 644 and Route 651 (Smith Point Road)

Westmoreland County

Mobile Pavement Marking

Monday – Thursday, 7 a.m. – 5 p.m. Mobile lane closures with one-way, alternating traffic. A flagging crew will direct traffic through the work zone at the following intersections:

Route 633 (Holly Vista Drive) with Route 1327 (Alma Lane)

Route 600 (Nomini Hall Road) with Route 614 (Weldons Road)

Additional Projects in Fredericksburg District

 

Caroline County

Route 1 over South River Bridge Rehabilitation

Construction is nearing completion on a $4 million project to rehabilitate the Route 1 bridge over the South River, which is located in the Ladysmith area. Since work began in Feb. 2023, the condition of the 97-year-old bridge was improved through substructure and superstructure repairs, and installation of a new concrete travel surface. All four lanes of Route 1 were scheduled to reopen to traffic on Friday, Dec. 8. Check 511virginia.org for real-time updates.

Route 639 (Ladysmith Road) Widening

Construction is nearing completion to widen Route 639 (Ladysmith Road) to four lanes between I-95 and just west of Route 1. A new raised median separates the eastbound and westbound lanes to allow for improved movement through the corridor. Additional left and right turn lanes have been built on Ladysmith Road at the Route 1 intersection. A shared use path, sidewalks, crosswalks, and pedestrian crossing equipment are being installed. Project completion was scheduled for May 2024.

King and Queen County and King William County

Route 628 (Dorrell Road/Spring Cottage Road) Bridge Closure

Dorrell Road/Spring Cottage Road is closed at the bridge over the Mattaponi River, located at the King and Queen and King William county line. The road will remain closed until spring 2025 while a bridge superstructure replacement project is designed and constructed. During a routine inspection, crews identified significant deterioration in key bridge elements and the bridge was closed in March 2023 for motorist safety. Motorists should follow signs posted along the detour route.

King and Queen County

Route 14 (The Trail)

Route 14 is reduced to a single lane near Route 621 (Bruington Road) for pipe repair, but both lanes are anticipated to reopen on Monday, Dec. 18. A temporary signal is installed to alternate one-way traffic between Edgehill Lane and Powcan Road. Check 511virginia.org for real-time updates.

King William County

Route 629 (Jacks Creek Road)

A portion of Jacks Creek Road is closed through Jan. 2024 for the installation of a concrete box culvert. The project is replacing the existing culvert, which consists of three corrugated metal drainage pipes built in 1943. A detour is in place.

Richmond County

Route 637 (County Bridge Road)

County Bridge Road is closed to through traffic at the bridge over Cat Point Creek due to damage following heavy rain and flooding in summer 2021. A bridge replacement is under construction. County Bridge Road will remain closed to through traffic until the new bridge reopens by April 2024.

Spotsylvania County

I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound

A second right turn lane is under construction from the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound is being widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is being added from Route 1 southbound to Southpoint Parkway. Traffic islands will be installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic exiting from side streets. Additional right turn lane added to Southpoint Parkway to Route 1 southbound. Project completion in Aug. 2025.

Route 3 and Orange Plank Road

Construction is underway to modify the intersection of Route 3 and Orange Plank Rd. to a new traffic pattern to enhance safety, improve traffic flow, and reduce conflict points. Project completion in late fall 2023.

Route 17 (Mills Drive) Overpass Replacement and Widening

Construction started in Dec. 2020 to replace the existing two-lane interstate overpass on Route 17 with a four-lane bridge. Route 17 is being widened to four lanes until just east of the Hospital Boulevard/Germanna Point Drive intersection. A shared-use path, sidewalk, and pedestrian crossing equipment will be added as part of the project. Project completion in Feb. 2024.

Route 208 (Courthouse Road) and Hood Drive

Hood Drive is reduced to a single lane between Route 1 and Route 208 (Courthouse Road), carrying only northbound traffic. Southbound traffic should follow the posted detour along Courthouse Road and Route 1 southbound. New right and left turn lanes are under construction at an entrance to a future U.S. Veterans Health Administration outpatient clinic. Additional turn lanes will be built on northbound Hood Drive approaching Courthouse Road. A raised median on Hood Drive will separate northbound and southbound traffic between Courthouse Road and McGowan Drive. Additional sidewalks, crosswalks, and pedestrian crossing equipment will be installed at the intersection. Project completion in June 2024.

Route 606 (Mudd Tavern Road) Widening

Mudd Tavern Road is being widened to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, will be built parallel to Mudd Tavern Road, and will connect with South Roxbury Mill Road and Dan Bell Lane. Route 606 (Mudd Tavern Road/Morris Road) is reduced to a single lane approaching the traffic signal at the Route 1 intersection through spring 2024 to allow space for widening activities. Project completion in May 2025.

Westmoreland County

Route 621 (North Tidwells Road) Bridge Replacement

North Tidwells Road is closed for a bridge replacement project over an unnamed tributary of the Lower Machodoc Creek. The road will be closed to traffic at the bridge until Jan. 2024. The project is replacing an existing timber deck bridge with a new concrete structure on concrete abutments and piles. Vehicles of all legal weights will be able to cross the new bridge. A detour route is posted.

Route 658 (Monroe Bay Circle)

Monroe Bay Circle is reduced to a single travel lane with a temporary bridge spanning Monroe Creek. A temporary traffic signal is directing one-way, alternating traffic. The bridge is a temporary measure to maintain traffic flow while a bridge replacement project is advanced.

Commuting and Ridesharing Information

 

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area, part of the George Washington Regional Commission.

 

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

Subscribe To Daily News Updates

Join our mailing list to receive the latest news from The Free Press

You have Successfully Subscribed!

Share This