Interstate 95 Southbound
Exit 126 (Spotsylvania) to Exit 118 (Thornburg)
Monday – Friday, 9 p.m.-5 a.m. Single lane closures at mile markers 126, 120-119, and 118 for bridge inspection.
Interstate 95 Northbound
Exit 118 (Thornburg) to Exit 126 (Spotsylvania)
Sunday – Thursday, 9 p.m.-4:30 a.m. Alternating lane closures between mile markers 121-126 for milling and paving mobile operation.
Exit 118 (Thornburg) to Exit 126 (Spotsylvania)
Monday – Friday, 9 p.m.-5 a.m. Single lane closures at mile markers 118, 119-120, and 126 for bridge inspection.
Exit 140 (Route 630/Courthouse Road) to Exit 143 (Aquia/Garrisonville)
Sunday – Thursday, 9 p.m.-4:30 a.m. Alternating lane closures between mile markers 140-142 for milling and paving mobile operation.
Exit 143 (Aquia/Garrisonville) to Exit 148 (Quantico)
Sunday – Thursday, 9 p.m.-4:30 a.m. Alternating lane closures between mile markers 146-148 for milling and paving mobile operation.
Caroline County
Route 1
Sunday – Thursday, 7 p.m.-6 a.m. Alternating lane closures on Route 1 northbound and southbound between Route 207 (Rogers Clark Boulevard) and Route 601 (Golansville Road). Pavement marking.
Monday – Friday, 8 a.m.-7 p.m. Alternating lane closures on Route 1 northbound and southbound between Route 207 (Rogers Clark Boulevard) and Route 601 (Golansville Road). Pavement marking.
Route 2
Monday – Friday, 8 a.m.-7 p.m. One-way, alternating traffic between Route 207 (Rogers Clark Boulevard) and the Spotsylvania County line. Milling and paving.
Route 207 (Rogers Clark Boulevard) Eastbound
Sunday – Thursday, 9 p.m.-5 a.m. Alternating lane closures on Route 207 eastbound at the bridge over the Mattaponi River. Construction for major bridge rehabilitation project.
Route 301 Southbound
Monday – Friday, 9 a.m.-3:30 p.m. Single lane closure near Warrior Road. Guardrail installation.
Route 639 (Ladysmith Road)
Monday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic west of the Route 1 intersection near Bridlewood Lane. Installation of drainage pipe underneath the road for residential development under permit.
City of Fredericksburg
Route 1 Southbound
Sunday – Friday, 9 p.m.-5 a.m. Right lane closure between Wellford Street and Fall Hill Avenue. Construction for intersection improvement project.
Fall Hill Avenue
Monday – Wednesday, 9 a.m.-3 p.m. Right turn lane closure at the Route 1 intersection. Construction for intersection improvement project.
Wellford Street
Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures near the Route 1 intersection. Construction for intersection improvement project.
Spotsylvania County
Route 1
Sunday – Thursday, 8 p.m.-6 a.m. Mobile operation with alternating lane closures on Route 1 northbound and southbound between the Ni River bridge and Filter Lane for pavement marking work.
Route 1
Monday – Friday, 9 a.m.-3 p.m. Intermittent right lane closure between Spotsylvania Parkway and Massaponax Church Road. Fiber install under permit.
Route 1 Southbound
Monday – Friday, 9 a.m.-3 p.m. Right lane closure between Route 606 (Massaponax Church Road) and Route 607 (Guinea Station Road) for gas main installation under permit.
Route 2 (Tidewater Trail)
Monday – Thursday, 9 p.m.-5 a.m. Single lane closure on Route 2 between Benchmark Road and Pierson Drive. Installation of water main under permit.
Route 3 (Plank Road) Westbound
Sunday – Thursday, 8 p.m.-6 a.m. Alternating lane closures for paving between Elys Ford Road and Wilderness Road.
Route 3 (Plank Road)
Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures for traffic signal work at the following intersections:
Route 610 (Old Plank Road/Route 675 (Five Mile Road)
Tuesday – Friday, 9 a.m.-3 p.m. Alternating lane closures for traffic signal work at the following intersections:
Route 688 (Single Oak Road)/Chancellor Village Road
Chancellor Center/Salem Church Crossing
Route 601 (Arritt Road)
Monday – Wednesday, 9 a.m.-7 p.m. Alternating single lane closures between the Spotsylvania County and Louisa County line and Route 622 (Fairview Road) for application of shoulder stone. Flaggers will direct traffic.
Route 606 (Mudd Tavern Road) DETOUR
Sunday – Tuesday, 11 p.m.-4 a.m. Eastbound Mudd Tavern Road will be closed between Route 1 and I-95 from 11 p.m. Sunday, July 27 to 4 a.m. Monday, July 28, weather permitting. If work is postponed, the detour will be rescheduled to occur from 11 p.m. Monday to 4 a.m. Tuesday, July 29. Westbound Mudd Tavern Road will remain open. Single lane closures will be in place on eastbound Mudd Tavern Road between 9 p.m. and 5 a.m. just before and after the detour.
Route 610 (Old Plank Road)
Monday – Friday, 9 a.m.-3 p.m. One-way alternating lane closures between Lewis Thornburg Road and Pullen Drive to install a roundabout under permit.
Route 620 (Spotswood Furnace Road)
Monday – Friday, 9 a.m.-8 p.m. Alternating lane closures for milling between River Road and Mills Road as part of a full-depth pavement rehabilitation project.
Route 620 (Harrison Road)
Monday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Old Plank Road and Gordon Road for road widening project.
Route 628 (Smith Station Road)
Wednesday – Thursday, 8 p.m.-6 a.m. One-way, alternating traffic between Route 208 (Courthouse Road) and Gordon Road. Crews will be adding new shoulder stone.
Route 711 (Southpoint Parkway)
Monday – Friday, 9 a.m.-3 p.m. Intermittent right lane closure between Courthouse Road and Route 1. Fiber install under permit.
Route 1196 (Stansbury Drive)
Monday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic near Harrison Road intersection for road widening project.
Route 1741 (East and West River Bend Road)
Wednesday – Friday, 9 a.m.-5 p.m. One-way, alternating traffic. Pavement marking.
Route 2162 (Cedar Hill Drive)
Wednesday – Friday, 9 a.m.-5 p.m. One-way, alternating traffic. Pavement marking.
Route 2175 (Aurora Lane)
Wednesday – Friday, 9 a.m.-5 p.m. One-way, alternating traffic. Pavement marking.
Route 2176 (Horizon View Court)
Wednesday – Friday, 9 a.m.-5 p.m. One-way, alternating traffic. Pavement marking.
Pipe Run subdivision
Monday – Friday, 9 a.m.-7 p.m. Application of shoulder stone along multiple routes in the subdivision. One-way, alternating traffic.
Spotsylvania Parkway
Monday – Friday 9 a.m.-3:30 p.m. Alternating lane closures between the Deep Creek Drive/Holley Oak Lane and New Berne Road/Yellow Birch Drive intersections. Installation of a Rectangular Rapid Flashing Beacon.
Three Cedars subdivision
Monday – Friday, 9 a.m.-7 p.m. Application of shoulder stone and pavement markings along multiple routes in the subdivision. One-way, alternating traffic.
Stafford County
Route 3 (Kings Highway)
Monday – Friday, 9 a.m.-3 p.m. Single lane closures between Route 607 (Cool Springs Road) and Route 3 (Blue and Gray Parkway). Fiber installation under permit.
Route 17 Southbound
Monday – Friday, 9 a.m.-3 p.m. Intermittent right lane closures on southbound Route 17 between Village Parkway and Hartwood Church Road to install waterline and sewer line under permit.
Route 218 (Butler Road)
Monday – Friday, 8 p.m.-5 a.m. Single lane closures between Route 607 (Cool Springs Road) and Route 1. Fiber installation under permit.
Route 601 (Hollywood Farm Road)
Wednesday – Friday, 9 a.m.-5 p.m. Pavement marking work between Caisson Road and Route 3 (Kings Highway). Flaggers will alternate one-way traffic through the work zone.
Route 2176 (Stableside Lane)
Wednesday – Friday, 9 a.m.-5 p.m. Application of pavement markings between Hollywood Farm Road and Gateway Drive. One-way, alternating traffic.
Additional Projects in Fredericksburg District
Caroline County
Route 638 (South River Road) Bridge Replacement
Construction is underway to replace the Route 638 (South River Road) bridge over South River. A portion of South River Road is closed with a detour in place. The project will be complete by Sept. 2025.
City of Fredericksburg
Route 1 at Fall Hill Avenue, and
Route 1 at Princess Anne Street and Hanson Avenue
Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Construction will be complete by June 2026. Intermittent single lane and shoulder closures will be needed at times, but most lane closures will occur overnight, and outside of peak weekday commute times.
Spotsylvania County
I-95 Exit 126 Area Improvements
Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion in Sept. 2027.
Route 606 (Mudd Tavern Road) Widening
Four travel lanes are now open on Mudd Tavern Road between I-95 and Route 1. A new secondary access route, Route 2092, remains under construction parallel to Mudd Tavern Road and will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion was scheduled for late May 2025, but final construction activities continue. Updates will be posted to the project page.
Route 620 (Harrison Road) Reconstruction and Widening
Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion in late summer 2026.
Commuting and Ridesharing Information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.