Interstate 95 Northbound
Exit 118 (Thornburg) to Exit 130 (Route 3)
Sunday – Monday, 10 p.m.-5 a.m. and Monday – Thursday, 9 p.m.-5 a.m. Single lane closures between mile markers 125-128 for milling and paving mobile operation.
Exit 140 (Courthouse Road) to Exit 143 (Aquia/Garrisonville)
Sunday – Thursday, 9 p.m.-4:30 a.m. Alternating lane closures between mile markers 140-142 for installation of pavement markers and rumble strips after recent paving.
Exit 143 (Aquia/Garrisonville) to Exit 148 (Quantico)
Sunday – Thursday, 9 p.m.- 4:30 a.m. Alternating lane closures between mile markers 146-148 for installation of pavement markers and rumble strips after recent paving.
Interstate 95 Southbound
Exit 140 (Courthound Road) to Exit 136 (Centreport Parkway)
Monday – Thursday, 9 p.m.-4:30 a.m. Alternating lane closures at mile markers 139-136 for milling and paving.
Caroline County
Route 1 Southbound
Monday – Friday, 9 a.m.-3 p.m. Single southbound lane closures and shoulder closures between Mudd Tavern Road/Morris Road in Spotsylvania and Ladysmith Road in Caroline. Fiber installation under permit.
Route 2
Monday – Thursday, 8 a.m.-7 p.m. and Friday, 8 a.m.-noon. One-way, alternating traffic between Route 207 (Rogers Clark Boulevard) and the Spotsylvania County line. Milling and paving.
Route 17
Monday – Thursday, 8 a.m.-7 p.m. and Friday, 8 a.m.-noon. Alternating lane closures for milling and paving from a mile north of Pepmeier Hill Road to the north end of the bridge over Mount Creek.
Route 207 (Rogers Clark Boulevard)
24/7. Single lane closures on Route 207 near the bridges over the Mattaponi River with work to rehabilitate the northbound bridge underway. Work zone is between Nelson Hill Road and Colonial Road. Speed limit has been reduced to 45 mph.
Route 301
Monday – Thursday, 8 a.m.-7 p.m. and Friday, 8 a.m.-noon. Alternating lane closures for milling and paving between just south of the Route 17intersection and the south end of the Rappahannock River bridge.
Route 639 (Ladysmith Road)
Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Miss Clara Lane and Bridlewood Lane. Installation of a turn lane in support of a new residential development, under permit.
Bridge Washing
Monday – Thursday, 8 a.m.-6 p.m. and Friday, 8 a.m.-noon. Mobile lane closures for bridge washing, which removes debris to protect bridge condition and prevent deterioration. Locations include:
• Route 1
• Route 2
• Route 17
• Route 207
• Route 301
• Route 600
• Route 601
• Route 603
• Route 605
• Route 626
• Route 632
• Route 638
• Route 639
• Route 640
• Route 644
• Route 647
• Route 646
• Route 648
• Route 652
• Route 654
• Route 662
• Route 665
• Route 684
• Route 722
• Route 743
City of Fredericksburg
Route 1 Southbound
Sunday – Thursday, 9 p.m.-5 a.m. Right lane closure between Charles Street and Fall Hill Avenue. Construction for intersection improvement project.
Route 2 (Dixon Street)
Monday – Thursday, 9 p.m.-6 a.m. Single lane closure on Route 2 between Beulah Salisbury Drive and Church Street for geotechnical work for a future construction project.
Fall Hill Avenue
Monday – Friday, 9 a.m.-3 p.m. Right turn lane closure at the Route 1 intersection. Construction for intersection improvement project.
Essex County
Route 360 Eastbound
Wednesday – Thursday, 9 a.m.-3 p.m. Single lane closure for guardrail repair on Route 360 eastbound, west of Piscataway Creek.
King George County
Route 218 (Caledon Road)
Wednesday – Thursday, 9 a.m.-3 p.m. Single lane closure for guardrail repair near Vertical Ridge Road.
Bridge Washing
Monday – Thursday, 8 a.m.-6 p.m. and Friday, 8 a.m.-noon. Mobile lane closures for bridge washing, which removes debris to protect bridge condition and prevent deterioration. Locations include:
• Route 3
• Route 206
• Route 218
• Route 301
• Route 603
• Route 622
• Route 625
Spotsylvania County
Route 1
Monday – Friday, 9 a.m.-3 p.m. Single northbound and southbound lane closures and shoulder closures between Spotsylvania Parkway and Massaponax Church Road. Fiber installation under permit.
Route 1 Southbound
Monday – Friday, 9 a.m.-3 p.m. Single southbound lane closures and shoulder closures between Mudd Tavern Road/Morris Road in Spotsylvania and Ladysmith Road in Caroline. Fiber installation under permit.
Route 1 Southbound
Monday – Friday, 9 p.m.-5 a.m. Single southbound lane closures and shoulder closures between Guinea Station Road and Mudd Tavern Road/Morris Road. Gas main installation work under permit.
Route 2/17 (Tidewater Trail)
Monday – Thursday, 9 p.m.-5 a.m. Lane closure. Water main installation work under permit.
Route 2/17 (Tidewater Trail)
Tuesday – Thursday, 9 a.m.-3:30 p.m. and Friday, 9 a.m.-noon. Single lane closure at intersection with Glenda’s Way and Briarwood Lane with one-way, alternating traffic. Installation of a traffic signal with crosswalk and pedestrian crossing signal equipment.
Route 2/17 (Tidewater Trail)
Monday – Thursday, 9 a.m.-3:30 p.m. Single lane closures with one-way, alternating traffic at the intersections with Benchmark Road and Mansfield Street/Lee Hill Drive. Traffic signal work.
Route 3 (Plank Road) Westbound
Monday – Tuesday 9 p.m.-5 a.m. Single westbound lane closures near the I-95 ramps and Carl D. Silver Parkway. Guardrail repairs.
Route 208 (Courthouse Road)
Monday – Thursday, 9 a.m.-5 p.m. Alternating lane closures for traffic signal work at Brittany Commons Boulevard and Breckenridge Drive.
Route 610 (Old Plank Road)
Wednesday – Friday, 9 a.m.-3 p.m. One-way alternating lane closures with flagging operation between Harrison Road and Gordon Road for road widening project.
Route 620 (Harrison Road)
Monday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Old Plank Road and Gordon Road for road widening project.
Route 621 (Orange Plank Road)
Monday – Tuesday, 9 p.m.-5 a.m. Guadrail repair at Route 3 intersection.
Route 711 (Southpoint Parkway)
Sunday – Thursday, 9 p.m.-5 a.m. Single lane closures between Route 1 and Route 208. Bridge maintenance.
Eagle Drive
Thursday, 9 a.m.-7 p.m. and Friday, 9 a.m.-noon. Pavement marking work between Route 17 and Lee Hill School Drive, following recent paving. One-way, alternating traffic.
Lee Hill School Drive
Monday – Thursday, 9 a.m.-7 p.m. and Friday, 9 a.m.-noon. Pavement marking work between Germanna Point Drive and Old Dominion Parkway and Old Dominion Parkway and Eagle Drive, following recent paving. One-way, alternating traffic.
Old Dominion Parkway
Wednesday – Thursday, 9 a.m.-7 p.m. and Friday, 9 a.m.-noon. Pavement marking work between Route 17 and Lee Hill School Drive, following recent paving. One-way, alternating traffic.
Bridge Washing
Monday – Thursday, 8 a.m.-6 p.m. and Friday, 8 a.m.-noon. Mobile lane closures for bridge washing, which removes debris to protect bridge condition and prevent deterioration. Locations include:
• Route 1 over Matta River, Ni River, Po River
• Route 2 over Deep Creek Run
• Route 3 over I-95, Nine Mile Branch, Wilderness Run
• Route 17 over CSX Railroad, Ruffin’s Pond
• Route 208 over Massaponax Creek
• Route 618 over Golin Run
• Route 620 (Harrison Road) over I-95
• Route 627 (Gordon Road) over Ni River
• Route 649 over Glady Run
• Route 738 over Arnold’s Creek and Matta River
Mobile Pavement Marking: Primary Roads
Sunday – Thursday, 7 p.m.-7 a.m. Mobile lane closures will be underway on multiple primary roads in Spotsylvania, which are numbered 599 and below, to refresh pavement markings:
• Route 1
• Route 208
• Route 208 Business
Sunday – Thursday, 7 p.m.-6 a.m.
• Route 2/17
Mobile Pavement Marking: Secondary Roads
Sunday – Thursday, 7 p.m.-6 a.m. Mobile lane closures will be underway on numerous secondary roads throughout Spotsylvania to refresh pavement markings, which are routes numbered 600 and above. Some of the higher-volume secondary roads where work will be underway include:
• Route 619
• Route 620
• Route 626
• Route 636
• Route 639
• Route 661
• Route 675
• Route 688
• Route 706
• Route 710
• Route 740
• Route 756
• Route 760
• Route 765
Stafford County
Route 3/Route 3 Business (Kings Highway)
Sunday – Thursday, 8 p.m.-5 a.m. Single eastbound and westbound lane closures and shoulder closures between Cool Springs Road and Forest Lane Road. Fiber installation under permit.
Route 17
Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Sanford Drive/South Gateway Drive and Falls Run Drive. Median improvements under permit.
Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Poplar Road and Hartwood Church Road. Median improvements under permit.
Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Hartwood Church Road and the Fauquier County line. Fiber installation under permit.
Route 218 (Butler Road)
Sunday – Thursday, 8 p.m.-5 a.m. Single lane closures and shoulder closures between Cool Springs Road and Route 1. Fiber installation under permit.
Route 624 (Barrett Heights Road)
Sunday – Thursday, 8 p.m.-6 a.m. Alternating lane closures with flagging for milling and paving between Garrisonville Road and Onville Road.
Route 641 (Onville Road)
Sunday – Thursday, 8 p.m.-6 a.m. Alternating lane closures with flagging for milling and paving between Aquia Creek bridge and Garrisonville Road.
Greenspring Drive
Monday – Thursday, 9 a.m.-7 p.m. and Friday, 9 a.m.-noon. Alternating lane closures with flagging for milling and paving between end of state maintenance and Route 684 (Mine Road).
Salisbury Drive
Monday – Thursday, 9 a.m.-7 p.m and Friday, 9 a.m.-noon. Alternating lane closures with flagging for milling and paving between Route 679 (Greenspring Drive) and Route 610 (Garrisonville Road).
Mobile Pavement Marking: Primary Roads
Sunday – Thursday, 7 p.m.-5 a.m. Mobile lane closures will be underway on multiple primary roads in Stafford, which are numbered 599 and below, to refresh pavement markings:
• Route 1
• Route 3
• Route 17
Mobile Pavement Marking: Secondary Roads
Sunday – Thursday, 7 p.m.-5 a.m. Mobile lane closures will be underway on numerous secondary roads throughout Stafford to refresh pavement markings, which are routes numbered 600 and above. Some of the higher-volume secondary roads where work will be underway include:
• Route 607
• Route 626
• Route 640
• Route 652
• Route 656
• Route 670
• Route 700
• Route 760
• Route 795
Additional Projects in Fredericksburg District
Caroline County
Route 207 Northbound Bridge Rehabilitation
Construction is underway to improve the northbound Route 207 (Rogers Clark Boulevard) bridge over the Mattaponi River. The project will replace steel plate girders, concrete deck, railing, bridge approaches, and make substructure repairs. Work is expected to be complete in April 2026.
City of Fredericksburg
Route 1 at Fall Hill Avenue, and
Route 1 at Princess Anne Street and Hanson Avenue
Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Construction will be complete by June 2026. Intermittent single lane and shoulder closures will be needed at times, but most lane closures will occur overnight, and outside of peak weekday commute times.
Spotsylvania County
I-95 Exit 126 Area Improvements
Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion in Sept. 2027.
Route 606 (Mudd Tavern Road) Widening
Four travel lanes are now open on Mudd Tavern Road between I-95 and Route 1. A new secondary access route, Route 2092, remains under construction parallel to Mudd Tavern Road and will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion was scheduled for late May 2025, but final construction activities continue. Updates will be posted to the project page.
Route 620 (Harrison Road) Reconstruction and Widening
Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion in late summer 2026.
Commuting and Ridesharing Information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.