Area road work this week

by | Jan 19, 2026 | Region, Ted Schubel, Transportation

Caroline County

Route 1

Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Route 639 (Ladysmith Road) and Route 207 (Rogers Clark Boulevard). Utility work under permit.

City of Fredericksburg

Route 1

Sunday – Wednesday, 10 p.m.-5 a.m. and Thursday, 9 a.m. – 2 p.m. Single lane closure between Charles Street and Falmouth Bridge for road widening project.

Spotsylvania County

Route 1

Sunday – Thursday, 9 p.m.-5 a.m. Alternating lane closures with police directing traffic for signal work at the Massaponax High School intersection.



Route 1

Monday – Friday, 9 a.m.-3 p.m. Single lane closures and shoulder closures between Mudd Tavern Road/Morris Road, Guinea Station Road/Mudd Tavern Road in Spotsylvania and Ladysmith Road in Caroline. Fiber installation under permit.

Route 3

Monday – Friday, 9 a.m.-3 p.m. Intermittent single lane and shoulder closures between Route 610 (Corter Avenue) and Route 20 (Constitution Highway). Fiber installation under permit.

Route 17 (Mills Drive)

Monday – Wednesday, 9 p.m.- 5 a.m. Alternating lane closures at Route 17, Route 17 Business and Route 2 intersection for signal work.

Route 208 (Courthouse Road) Eastbound

Monday – Friday, 9 a.m.-3 p.m. Single lane closure, with one-way alternating traffic, for guardrail work at the intersection with Clark Court.

Route 620 (Harrison Road)

Monday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic. Road widening between Gordon Road and Old Plank Road.

Route 627 (Gordon Road)

Sunday – Tuesday, 9 p.m.- 5 a.m. Alternating lane closures at Gordon Road and Old Plank Road intersection for signal work.

Route 636 (Mine Road)

Sunday – Thursday, 8 p.m.-5 a.m. Intermittent single lane and shoulder closures between Route 608 (Benchmark Road) and Lee Drive Extended. Fiber installation under permit.

Route 639 (Levells Road)

Monday – Friday, 9 a.m.- 3 p.m. Flagging operation between Smith Station Road and Three Cedars Lane for trail work under permit.

Stansbury Road

Monday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Harrison Road and Hanover Court for road widening work.

Stafford County

Route 1

Wednesday – Thursday, 9 p.m.-5 a.m. Alternating lane closures with police directing traffic for signal work at the following intersections with Route 1:

Route 17 and Route 218
Route 1015 (Lendall Lane/Solomon Drive)

Route 1 Northbound

Monday – Thursday, 9 p.m.-6 a.m. Single lane closure for guardrail work near the intersection of Route 676 (Cranes Corner Road).

Route 3 (Kings Highway) Eastbound

Monday – Friday, 9 a.m.-3 p.m. Single lane closure for guardrail work near the intersection with Carol Street.

Route 17

Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Poplar Road and Hartwood Church Road. Median improvements under permit.

Route 17 Business (Warrenton Road)

Monday – Friday, 10 a.m.-2 p.m. Northbound single lane closure on for guardrail work near Route 1001 (Washington Street).

Route 608 (Brooke Road)

Tuesday – Thursday, 7 a.m.- 4:30 p.m. Pipe repair. Flaggers will alternate one-way traffic on Brooke Road between Dogwood Drive and Sleepy Hollow Trail.

Route 610 (Garrisonville Road)

Tuesday – Thursday, 9 p.m.-5 a.m. Alternating lane closures with police directing traffic for signal work at Parkway Boulevard intersection.

Additional Projects in Fredericksburg District

Caroline County

Route 207 Northbound Bridge Rehabilitation

Construction is underway to improve the northbound Route 207 (Rogers Clark Boulevard) bridge over the Mattaponi River. The project will replace steel plate girders, concrete deck, railing, bridge approaches, and make substructure repairs. Northbound Route 207 traffic is diverted to cross the Mattaponi River using the Route 207 southbound bridge, with one travel lane open in each direction. During the closure, Route 207 northbound will remain closed until the completion of the project. Work is expected to be complete in April 2026.

City of Fredericksburg

Route 1 at Fall Hill Avenue, and

Route 1 at Princess Anne Street and Hanson Avenue

Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Construction will be complete by June 2026. Intermittent single lane and shoulder closures will be needed at times, but most lane closures will occur overnight, and outside of peak weekday commute times.


Spotsylvania County

I-95 Exit 126 Area Improvements

Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion in Sept. 2027.

Route 620 (Harrison Road) Reconstruction and Widening

Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion in late summer 2026.


Stafford County

Route 1 at Telegraph Road and Woodstock Lane

Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left turn lanes will be built from Telegraph Road onto Route 1 southbound. A left turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion in fall 2026. Visit the county project page.

Route 1 and Courthouse Road Intersection Improvement Project

Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion in summer 2027. Visit the county project page.


Commuting and Ridesharing Information

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

Share This