;

Area road work this week

by | Jun 15, 2026 | Region, Ted Schubel, Transportation

I-95 Northbound

Exit 143 (Aquia/Garrisonville)

Thursday – Friday, 9 p.m.-5 a.m. Milling and paving near exit 143 (Aquia/Garrisonville) between mile markers 142-145 in Stafford County. Single lane closure begins at 9 p.m. Double lane closure starts at 10 p.m. All southbound lanes reopen by 5 a.m.

I-95 Southbound

Exit 143 (Aquia/Garrisonville)

Sunday – Friday, 9 p.m.-5 a.m. Milling and paving near exit 143 (Aquia/Garrisonville) between mile markers 145-141 in Stafford County. Single lane closure begins at 9 p.m. Double lane closure starts at 10 p.m. All southbound lanes reopen by 5 a.m.

Exit 143 (Aquia/Garrisonville) Off-Ramp to Route 610 Eastbound

Sunday – Friday, 10 p.m.-5 a.m. Overnight off-ramp closure for milling and paving. I-95 southbound travelers seeking exit 143 should use the most convenient alternate interchange, including exit 148 (Quantico) to Route 1.

Exit 143 (Aquia/Garrisonville) On-Ramp from Route 610 Westbound

Sunday – Friday, 10 p.m.-5 a.m. Overnight on-ramp closure for milling and paving. Travelers seeking to enter I-95 southbound from Route 610 may use the Route 610 eastbound on-ramp to I-95 southbound, which will remain open on these two evenings, or the most convenient alternate I-95 interchange.

Exit 143 (Aquia/Garrisonville) Off-Ramp to Route 610 Westbound

Wednesday – Thursday, 10 p.m.-5 a.m. Overnight off-ramp closure for milling and paving. I-95 southbound travelers seeking exit 143 should use the most convenient alternate interchange, including exit 148 (Quantico) to Route 1.

Exit 143 (Aquia/Garrisonville) On-Ramp from Route 610 Eastbound

Monday – Wednesday, 10 p.m.-5 a.m. Overnight on-ramp closure for milling and paving. Travelers seeking to enter I-95 southbound from Route 610 may use the Route 610 westbound on-ramp to I-95 southbound, which will remain open on these two evenings, or use the most convenient alternate I-95 interchange.

Caroline County

Route 1

Monday – Friday, 9 a.m.-3 p.m. Single lane closures and shoulder closures between Mudd Tavern Road/Morris Road in Spotsylvania and Ladysmith Road in Caroline. Fiber installation under permit.

Route 1

Monday – Friday, 9 a.m.-3 p.m. Single lane closures and shoulder closures between Ladysmith Road and Route 207 (Rogers Clark Boulevard). Utility work under permit.

Route 17 Northbound

Monday – Friday, 7 a.m.- 5 p.m. Road resurfacing. Alternating lane closures between Hazelwood Lane and Mount Creek Bridge.

Route 301 Northbound

Sunday – Thursday, 7 p.m.- 6 a.m. Mobile milling operation between O’Brien Court and Route 301 Business.

Guardrail work

Monday – Friday, 9 a.m.-3:30 p.m. Single lane and shoulder closures, with a flagging crew directing traffic as needed:

Route 207 (Rogers Clark Boulevard) near Route 601
Route 632, between Route 1 and Nancy Wrights Drive
Route 685 (Jon Road) near Route 639

Secondary Road Surface Treatment

Monday – Friday, 9 a.m.-3:30 p.m. Road resurfacing with surface treatment. Flagging crew will direct one-way, alternating traffic on the following routes:

Route 638
Route 680
Route 765
City of Fredericksburg

Route 1

Sunday – Friday, 10 p.m.-5 a.m. Alternating lane closures on Route 1 northbound and southbound between Fall Hill Avenue and Falmouth Bridge. Intersection improvement project.

Fall Hill Avenue

Monday – Friday, 9 a.m.-3 p.m. and 10 p.m.-5 a.m. Alternating lane closures on Fall Hill Avenue between Bridgewater Street and Wallace Street. Intersection improvement project.

Princess Anne Street

Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures on Princess Anne Street between Route 1 and Amaret Street. Intersection improvement project.

King George County

Route 3

Sunday – Friday, 7 p.m.-7 a.m. Mobile pavement marking between Stafford County line and Westmoreland County line.

Cleydale subdivision

Monday – Friday, 7 a.m.-5 p.m. Road resurfacing with cape seal treatment. Flagging crew will direct one-way, alternating traffic on various routes.

Guardrail Work

Monday – Friday, 9 a.m.- 3:30 p.m. Flaggers will alternate one-way traffic on various routes:

Route 3 near Route 694
Route 218 near Route 603
Route 301 near Route 218

Spotsylvania County

Route 1

Monday – Friday, 9 a.m.-3 p.m. Single lane closures and shoulder closures between Mudd Tavern Road/Morris Road in Spotsylvania and Ladysmith Road in Caroline, also on Route 1 southbound between Massaponax Church Road and Ladysmith Road in Caroline. Fiber installation under permit.

Route 1 Northbound

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work. Single lane closures on northbound Route 1 near Route 632 (Roxbury Mill Road) and northbound Route 1 near Route 606 (Mudd Tavern Road/Morris Road).

Route 1 Northbound

Sunday – Thursday, 8 p.m.-5 a.m. Right lane closure between Crossing Court and Market Street. for construction on I-95 exit 126 area improvements.

Route 1 Southbound

Sunday – Thursday, 8 p.m.-5 a.m. Right lane closure between Market Street and the I-95 southbound off-ramp at exit 126 (Spotsylvania) for construction on I-95 interchange area improvements.

Route 3 Westbound

Monday – Wednesday, 8:30 a.m.-7 p.m. Right lane closure to widen the shoulder between Andora Drive and Montpelier Drive.

Route 17 (Mills Drive)

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work. Alternating lane closures on southbound Route 17 near Route 608 (Massaponax Church Road).

Route 608 (Robert E. Lee Drive)

Monday – Friday, 9 a.m.-7 p.m. Shoulder widening work. Flagging crew will alternate one-way traffic between Route 208 and Catharpin Road.

Route 608 (Benchmark Road)

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work. Flagging crew will alternate one-way traffic near Massaponax Creek.

Route 610 (Old Plank Road)

Wednesday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Ziyad Drive and Gordon Road. Road widening project.

Route 620 (Harrison Road)

Wednesday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Gordon Road and Old Plank Road. Road widening project.

Route 634 (Flippo Drive)

Monday – Friday, 9 a.m.-5 p.m. Road resurfacing using a cape seal treatment between Guinea Station Road and Massaponax Church Road. Flagging crew will alternate one-way traffic in the work zone.

Route 673 (Piedmont Drive)

Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work. Flagging crew will alternate one-way traffic at Royals Oaks Drive.

Ashleigh Park subdivision

Monday – Tuesday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct traffic on various routes.

Chancellor Green subdivision

Thursday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct traffic on various routes.

The Timbers subdivision

Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct traffic on various routes.

Surface Treatment

Monday – Friday, 9 a.m.-3:30 p.m. Road resurfacing with flagging crew to alternate one-way traffic on the following routes :

Route 641
Route 657
Route 670
Route 724
Route 990
Route 991
Route 992
Stafford County

Route 1

Monday – Friday, 9 a.m.-3 p.m. Single lane closures on Route 1 northbound and southbound between Hospital Center Boulevard and Centreport Parkway for fiber installation under permit.

Route 17

Monday – Friday, 9 a.m.-3 p.m. Median improvements under permit. Expect alternating northbound and southbound lane closures on Route 17 between Poplar Road and the entrance to the Cardinal Forest subdivision.

Route 608 (Brooke Road)

Monday, 9 a.m.- 7 p.m. Paving. Flaggers will direct traffic between Andrew Chapel Road and Maplewood Drive.

Route 626 (Potomac Run Road)

Wednesday – Friday, 9 a.m.- 7 p.m. Paving. Flaggers will direct traffic between Leeland Road and Eskimo Hill Road.

Route 646 (Tacketts Mill Road)
Monday – Tuesday, 9 a.m.-7 p.m. Paving. Flagging crew will alternate one-way traffic between Poplar Road and Heflin Road.

Route 662 (Stony Hill Road)

Sunday – Tuesday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Hartwood Road and Poplar Road.

Route 687 (Hope Road)

Tuesday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Route 1 and Quail Run Drive.

Route 751 (Hampton Park Road)

Wednesday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Parkway Boulevard and Eustace Road.

Route 1264 (Parkway Boulevard)

Thursday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Flatford Road and Route 610 (Garrisonville Road).

Route 1304 (Stafford Avenue)

Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Courthouse Road and Hope Road.

Route 1769

Monday – Friday, 9 a.m.- 3:30 p.m. Guardrail work between Little Forest Church Road and Telegraph Road. Flagging crew will alternate one-way traffic near the repair.

Hampton Oaks subdivision

Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct traffic on various routes for road resurfacing.

Guardrail Work

Sunday – Thursday, 9 p.m.- 6 a.m. Guardrail work with right lane closures on the following routes:

Route 3 westbound near Cool Springs Road
Route 17 northbound near I-95 southbound off-ramp
Route 17 southbound near I-955 southbound off-ramp
Route 17 southbound near Tensley Lane ( 9 a.m.- 3:30 p.m.)


Additional Projects in Fredericksburg District

Caroline County

Route 207 Northbound Bridge Rehabilitation

Construction is underway to improve the northbound Route 207 (Rogers Clark Boulevard) bridge over the Mattaponi River. The project will replace steel plate girders, concrete deck, railing, bridge approaches, and make substructure repairs. Northbound Route 207 traffic is diverted to cross the Mattaponi River using the Route 207 southbound bridge, with one travel lane open in each direction. During the closure, Route 207 northbound will remain closed until the completion of the project. Project completion expected in June 2026.

City of Fredericksburg

Route 1 at Fall Hill Avenue, and

Route 1 at Princess Anne Street and Hanson Avenue

Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Project completion expected in June 2026.


Spotsylvania County

I-95 Exit 126 Area Improvements

Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion is expected in Sept. 2027.

Route 620 (Harrison Road) Reconstruction and Widening

Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion expected in Sept. 2026.


Stafford County

Route 1 Bridge Replacement at Chopawamsic Creek

Construction is underway on a $13.9 million project to replace the four-lane Route 1 bridge over Chopawamsic Creek. The bridge is located just south of the Prince William County line and is near Quantico Marine Corps Base. Construction is expected to be complete in June 2028. Four travel lanes will remain open at most times during construction, with periodic lane closures needed during off-peak times as traffic is shifted to complete the bridge construction in phases.

Route 1 at Telegraph Road and Woodstock Lane

Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left turn lanes will be built from Telegraph Road onto Route 1 southbound. A left turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion in fall 2026. Visit the county project page.

Route 1 and Courthouse Road Intersection Improvement Project

Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion expected in summer 2027. Visit the county project page.

Route 644 (Rock Hill Church Road) Bridge Replacement

Route 644 (Rock Hill Church Road) closed to allow crews to replace the single-lane structure over Aquia Creek with a two-lane bridge. The new two-lane bridge will be nearly double the size of the existing structure. Rock Hill Church Road will be closed to through traffic between Dunbar Drive and Van Horn Lane with a detour in place until June 2027.


Commuting and Ridesharing Information

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

Share This