I-95 Northbound
Exit 130 (Route 3/Fredericksburg)
Wednesday – Thursday, 8 p.m.-4 a.m. Scheduled bridge inspection of Route 3 overpasses of I-95. Alternating single northbound lane closures.
Exit 143 (Aquia/Garrisonville)
Sunday – Monday, 10 p.m.-4:30 a.m., and Monday – Thursday, 9 p.m.-4:30 a.m. Milling and paving near exit 143 (Aquia/Garrisonville) between mile markers 142-145 in Stafford County. Single lane closures begin at 10 p.m. Sunday night and 9 p.m. Monday-Thursday nights, and double lane closures begin at 11 p.m. Sunday and at 10 p.m. all other nights. All northbound lanes reopen by 4:30 a.m.
I-95 Southbound
Exit 130 (Route 3/Fredericksburg)
Wednesday – Thursday, 8 p.m.-4 a.m. Scheduled bridge inspection of Route 3 overpasses of I-95. Alternating single southbound local and through travel lane closures.
Exit 126 (Spotsylvania)
Sunday – Monday, 10 p.m.-7 a.m., and Monday – Thursday, 8 p.m.-7 a.m. Single lane closure at mile markers 128-126 for construction at exit 126 interchange.
Exit 110 (Ladysmith)
Monday – Thursday, 7 a.m.-4 p.m. Shoulder closures near the exit 110 (Ladysmith) interchange and off-ramp. All travel lanes and ramp lanes remain open. Crews will be performing drainage pipe and roadside maintenance along the shoulders of the interstate travel lanes and off-ramp. Shoulder closures will be removed by 3 p.m. Thursday. Travelers should use caution and stay alert for equipment along the shoulders.
Caroline County
Route 1
Monday – Thursday, 9 a.m.-3 p.m. Single lane closures and shoulder closures between Ladysmith Road and Route 207 (Rogers Clark Boulevard). Fiber installation under permit.
Route 17 (Tidewater Trail) Northbound
Monday – Friday, 7 a.m.-5 p.m. Pavement marking. Alternating lane closures between Hazelwood Lane and Mount Creek Bridge.
Route 207 (Rogers Clark Boulevard)
Monday – Friday, 8 a.m.-7 p.m. Milling and paving. Alternating lane closures on northbound Route 207 between Polecat Creek bridge and Devils Three Jump Road, and on Route 207 southbound between the Mattaponi River bridge and the railroad bridge.
Route 603 (Countyline Church Road)
Monday – Friday, 9 a.m.-3:30 p.m. Single lane closure near route 639 (Ladysmith Road). Guardrail installation.
Route 676 (Devils Three Jump Road)
Monday – Friday, 7 a.m.-5 p.m. Pavement marking. Alternating lane closures between Route 207 and Nelson Hill Road.
City of Fredericksburg
Route 1
Tuesday – Friday, 10 p.m.-5 a.m. Alternating lane closures on Route 1 northbound and southbound between Fall Hill Avenue and Falmouth Bridge. Intersection improvement project.
Route 3
Wednesday – Thursday, 8 p.m.-4 a.m. Scheduled bridge inspection of Route 3 overpasses of I-95. Single eastbound and westbound lane closures at the bridges, between Carl D. Silver Parkway and Gateway Boulevard.
Route 3 Eastbound
Sunday – Thursday, 9 p.m.-5 a.m. Single lane closure near Carl D. SIlver Parkway intersection. Guardrail installation.
Fall Hill Avenue
Tuesday – Friday, 9 a.m.-3 p.m. and 10 p.m.-5 a.m. Alternating lane closures on Fall Hill Avenue between Bridgewater Street and Wallace Street. Intersection improvement project.
Princess Anne Street
Tuesday – Friday, 9 a.m.-3 p.m. Alternating lane closures on Princess Anne Street between Route 1 and Amaret Street. Intersection improvement project.
Route 641
Route 671
Route 700
Route 738
Route 750
ROute 775
Route 792
Route 1037
Route 1074
King George County
Monday – Friday, 9 a.m.-3:30 p.m. Guardrail installation. Single lane closure.
King George County
Route 3
Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work. Single lane closure on Route 3 eastbound near Route 694 (Lambs Creek Church Road).
Route 218
Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work. Single lane closure on Route 218 near Machodoc Creek. Flagging crew will direct one-way, alternating traffic.
Spotsylvania County
Route 1
Monday – Friday, 9 a.m.-3 p.m. Single lane closure on Route 1 southbound between Ladysmith Road and Massaponax Church Road for fiber installation under permit.
Route 1 Northbound
Monday – Friday, 9 a.m.-3 p.m. Single lane closure on northbound Route 1 between Ondura Drive and Guinea Station Road for waterline work under permit.
Route 1 Northbound: TRAFFIC SHIFT
Monday – Thursday, 8 p.m.-5 a.m. Right lane closure between Crossing Court and Market Street for construction of I-95 exit 126 area improvements. On the evening of Tuesday, July 14, into early Wednesday, July 15, northbound Route 1 traffic will be shifted slightly left onto new pavement. Travelers should follow the direction of crews, pavement markings, and barrels. This shift will allow crews to continue working to widen Route 1 to three northbound and southbound lanes near the I-95 interchange.
Route 1 Southbound
Monday – Thursday, 8 p.m.-5 a.m. Right lane closure between Market Street and the I-95 southbound off-ramp at exit 126 (Spotsylvania) for construction on I-95 interchange area improvements.
Route 2 (Tidewater Trail)
Monday – Friday, 9 a.m.-3:30 p.m. Single lane closure near Ruffins Pond. Flagging crew will direct one-way, alternating traffic. Guardrail installation.
Route 3 Westbound
Sunday – Tuesday, 8:30 p.m.-5 a.m. Right lane closure to apply pavement markings following recent work to widen the shoulder between Andora Drive and Montpelier Drive.
Route 3 Eastbound
Sunday – Tuesday, 8:30 p.m.-5 a.m. Right lane closure to apply pavement markings following recent work to widen the shoulder between Route 20 (Constitutional Boulevard) and Orange Plank Road.
Route 17 (Mills Drive)
Monday – Friday, 7 p.m.-6 a.m. Guardrail work. Alternating lane closures on southbound Route 17 near Route 608 (Massaponax Church Road) and Crossroads Parkway, as well as between Old Dominion Parkway and Massaponax Church Road.
Route 208 (Courthouse Road)
Monday – Thursday, 7 a.m.-4:30 p.m. Drainage pipe replacement near Spotsylvania Middle School. Flagging crew will direct one-way, alternating traffic.
Route 208 Eastbound
Monday – Friday, 9 a.m.-3:30 p.m. Single lane closure near Foster Road. Flagging crew will direct one-way, alternating traffic. Guardrail installation.
Route 608 (Robert E. Lee Drive)
Monday – Friday, 9 a.m.-7 p.m. Paving, following recent shoulder widening work. Flagging crew will alternate one-way traffic between Route 208 and Catharpin Road.
Route 610 (Old Plank Road)
Tuesday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Ziyad Drive and Gordon Road. Road widening project.
Route 620 (Harrison Road)
Tuesday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Gordon Road and Old Plank Road. Road widening project.
Route 627 (Gordon Road)
Tuesday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Legacy Woods and Old Plank Road. Road widening project.
Route 634 (Flippo Drive)
Monday – Friday, 9 a.m.-5 p.m. Cape seal and pavement markings. Flagging crew will alternate one-way traffic between Guinea Road and Massaponax Church Road.
Route 639 (Leavells Road)
Monday – Friday, 9 a.m.-3:30 p.m. Single lane closure near Massaponax Creek. Flagging crew will direct one-way, alternating traffic. Guardrail installation.
Stafford County
Route 1 Northbound
Sunday – Thursday, 9 p.m.-5 a.m. Guardrail work. Single lane closure near Bells Hill Road/Coal Landing Road.
Route 3 Eastbound
Sunday – Thursday, 9 p.m.-5 a.m. Guardrail work. Single lane closure near Naomi Road.
Route 17
Monday – Friday, 9 a.m.-3 p.m. Median improvements under permit. Expect alternating northbound and southbound lane closures on Route 17 between Poplar Road and the entrance to the Cardinal Forest subdivision.
Route 17 Southbound
Monday – Friday, 9 a.m.-3 p.m. Guardrail work. Single lane closure near Tensley Lane.
Route 606 (Ferry Road)
Monday – Tuesday, 9 a.m.-7 p.m. Application of fresh shoulder stone. Flagging crew will direct one-way, alternating traffic between Route 3 Business and White Oak Road.
Route 610 at Aquia Creek Bridge
Monday – Friday, 9 a.m.-3 p.m. Guardrail work. Flagging crew will alternate one-way traffic at the Aquia Creek bridge.
Route 627 (Mountain View Road)
Tuesday – Thursday, 9 a.m.-7 p.m. Milling and paving. Flagging crew will direct one-way, alternating traffic between Carter Lane and Poplar Road, as well as Kellogg Mill Road and Wood Road.
Route 652 (Truslow Road)
Monday – Friday, 9 a.m.-3 p.m. Milling and paving between Route 1 and Enon Road, as well as Berea Church Road and Poplar Road. Flaggers will alternate one-way traffic through the work zone.
Route 709 (Flatford Road)
Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Winding Creek Road and Ashbrook Road.
Route 709 (Walpole Street)
Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Winding Creek Road and Courthouse Road.
Route 751 (Hampton Park Road)
Monday – Friday, 9 a.m.-7 p.m. Pavement marking. Flagging crew will direct one-way, alternating traffic between Parkway Boulevard and Eustace Road.
Route 1264 (Parkway Boulevard)
Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Flatford Road and Route 610 (Garrisonville Road).
Brentwood Estates subdivision
Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct traffic on various routes for road resurfacing.
Additional Projects in Fredericksburg District
City of Fredericksburg
Route 1 at Fall Hill Avenue, and
Route 1 at Princess Anne Street and Hanson Avenue
Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Project completion expected in July 2026.
Spotsylvania County
I-95 Exit 126 Area Improvements
Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion is expected in Sept. 2027.
Route 620 (Harrison Road) Reconstruction and Widening
Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion expected in Sept. 2026.
Stafford County
Route 1 Bridge Replacement at Chopawamsic Creek
Construction is underway on a $13.9 million project to replace the four-lane Route 1 bridge over Chopawamsic Creek. The bridge is located just south of the Prince William County line and is near Quantico Marine Corps Base. Construction is expected to be complete in June 2028. Four travel lanes will remain open at most times during construction, with periodic lane closures needed during off-peak times as traffic is shifted to complete the bridge construction in phases.
Route 1 at Telegraph Road and Woodstock Lane
Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left turn lanes will be built from Telegraph Road onto Route 1 southbound. A left turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion in fall 2026. Visit the county project page.
Route 1 and Courthouse Road Intersection Improvement Project
Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion expected in summer 2027. Visit the county project page.
Route 644 (Rock Hill Church Road) Bridge Replacement
Route 644 (Rock Hill Church Road) is closed to replace the temporary single-lane structure over Aquia Creek with a two-lane bridge. Rock Hill Church Road will remain closed to through traffic between Dunbar Drive and Van Horn Lane with a detour in place until June 2027.
Commuting and Ridesharing Information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

















