I-95 Southbound
Exit 130 (Route 3/Fredericksburg)
Monday – Wednesday, 8 p.m.-4 a.m. Scheduled bridge inspection of Route 3 overpasses of I-95. Alternating single southbound local and through travel lane closures.
Exit 126 (Spotsylvania)
Sunday – Wednesday, 10 p.m. – 4 a.m. Route 1 northbound and southbound on-ramp to southbound I-95 closed for construction with a detour. Read the release.
Exit 110 (Ladysmith)
Monday – Thursday, 7 a.m.-4 p.m. Shoulder closures near the exit 110 (Ladysmith) interchange and off-ramp. All travel lanes and ramp lanes remain open. Crews will be performing drainage pipe and roadside maintenance along the shoulders of the interstate travel lanes and off-ramp. Shoulder closures will be removed by 3 p.m. Thursday. Travelers should use caution and stay alert for equipment along the shoulders.
I-95 Northbound
Exit 126 (Spotsylvania)
Thursday – Friday, 10 p.m. – 4 a.m. I-95 northbound off-ramp to southbound Route 1 closed for construction with a detour. Read the release.
Exit 130 (Route 3/Fredericksburg)
Monday – Wednesday, 8 p.m.-4 a.m. Scheduled bridge inspection of Route 3 overpasses of I-95. Alternating single northbound lane closures.
Exit 143 (Aquia/Garrisonville)
Sunday – Monday, 10 p.m.-4:30 a.m., and Monday – Thursday, 9 p.m.-4:30 a.m. Milling and paving near exit 143 (Aquia/Garrisonville) between mile markers 142-145 in Stafford County. Single lane closures begin at 10 p.m. Sunday night and 9 p.m. Monday-Thursday nights, and double lane closures begin at 11 p.m. Sunday and at 10 p.m. all other nights. All northbound lanes reopen by 4:30 a.m.
Exit 143 (Aquia/Garrisonville) Ramp Closures
Sunday – Monday, 10 p.m. – 4:30 a.m. I-95 northbound off-ramp to Route 1 will close for milling and paving operations.
Monday – Tuesday, 10 p.m. – 4:30 a.m. I-95 northbound on-ramp from Route 610 and I-95 northbound off-ramp to Route 610 westbound toward Garrisonville will close for milling and paving operations.
Wednesday – Thursday, 10 p.m. – 4:30 a.m. I-95 northbound off-ramp to Route 1 will close for milling and paving operations.
Caroline County
Route 1
Monday – Thursday, 9 a.m.-3 p.m. Single lane closures and shoulder closures between Ladysmith Road and Route 207 (Rogers Clark Boulevard). Fiber installation under permit.
Route 17 (Tidewater Trail) Northbound
Monday – Friday, 7 a.m.-5 p.m. Pavement marking. Alternating lane closures between Hazelwood Lane and Mount Creek Bridge.
Route 207 (Rogers Clark Boulevard)
Monday – Friday, 8 a.m.-7 p.m. Milling and paving. Alternating lane closures on northbound Route 207 between Polecat Creek bridge and Devils Three Jump Road, and on Route 207 southbound between the Mattaponi River bridge and the railroad bridge.
Route 676 (Devils Three Jump Road)
Monday – Friday, 7 a.m.-5 p.m. Pavement marking. Alternating lane closures between Route 207 and Nelson Hill Road.
Spotsylvania County
Route 1
Monday – Friday, 9 a.m.-3 p.m. Single lane closure on Route 1 southbound between Ladysmith Road and Massaponax Church Road for fiber installation under permit.
Route 1 Northbound
Monday – Friday, 9 a.m.-3 p.m. Single lane closure on northbound Route 1 between Ondura Drive and Guinea Station Road for waterline work under permit.
Route 1 Northbound
Monday – Thursday, 8 p.m.-5 a.m. Right lane closure between Crossing Court and Market Street for construction of I-95 exit 126 area improvements.
Route 1 Southbound
Monday – Thursday, 8 p.m.-5 a.m. Right lane closure between Market Street and the I-95 southbound off-ramp at exit 126 (Spotsylvania) for construction on I-95 interchange area improvements.
Route 1 at Route 606 (Mudd Tavern Road)
Wednesday – Thursday, 8 p.m.- 5 a.m. Utility work at intersection. Flaggers will direct drivers through the work zone.
Route 3 Westbound
Monday – Tuesday, 9 a.m.-5 p.m. Mobile operation with single lane closures to apply pavement markings following recent work to widen the shoulder between Andora Drive and Montpelier Drive.
Route 3 Eastbound
Monday – Tuesday, 9 a.m.-5 p.m. Mobile operation with single lane closures to apply pavement markings following recent work to widen the shoulder between Route 20 (Constitutional Boulevard) and Orange Plank Road.
Route 17 (Mills Drive)
Monday – Friday, 9 a.m. – 3:30 p.m. Guardrail work. Alternating lane closures on southbound Route 17 near Route 608 (Massaponax Church Road).
Route 208 (Courthouse Road/Lake Anna Parkway)
Sunday – Thursday, 8 p.m. – 6 a.m. Milling and paving at multiple locations with alternating lane closures for mobile operation.
Monday – Friday, 9 a.m.-3:30 p.m. Single lane closure on Route 208 eastbound near Foster Road. Flagging crew will direct one-way, alternating traffic. Guardrail installation.
Route 608 (Robert E. Lee Drive)
Monday – Friday, 9 a.m.-7 p.m. Paving, following recent shoulder widening work. Flagging crew will alternate one-way traffic between Route 208 and Catharpin Road.
Route 610 (Old Plank Road)
Tuesday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Ziyad Drive and Gordon Road. Road widening project.
Route 620 (Harrison Road)
Tuesday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Gordon Road and Old Plank Road. Road widening project.
Thursday – Friday, 9 p.m. – 5 a.m. ROAD CLOSURE between Old Plank Road and Gordon Road to allow crews to safely shift traffic as part of road widening project. Use alternate route overnight.
Route 627 (Gordon Road)
Tuesday – Saturday, 9 a.m.-3 p.m. One-way, alternating traffic between Legacy Woods and Old Plank Road. Road widening project.
Route 634 (Flippo Drive)
Monday – Friday, 9 a.m.-5 p.m. Cape seal and pavement markings. Flagging crew will alternate one-way traffic between Guinea Road and Massaponax Church Road.
Route 638 (Lansdowne Road)
Tuesday – Friday, 9 p.m.-5 a.m. Soil work. Flaggers will alternate one-way traffic between Shenandoah Road and Teton Drive.
Surry Woods Court
Monday – Thursday, 7 a.m.-4:30 p.m. Drainage pipe replacement near Ascot Circle. Follow traffic control near the work zone.
Stafford County
Route 1
Monday – Thursday, 9 a.m.- 3 p.m. Alternating lane closures between Corporate Drive and Russell Road for bridge construction.
Route 1 Northbound
Sunday – Thursday, 9 p.m.-5 a.m. Guardrail work. Single lane closure near Bells Hill Road/Coal Landing Road.
Route 3 Eastbound
Sunday – Thursday, 9 p.m.-5 a.m. Guardrail work. Single lane closure near Naomi Road.
Route 17
Monday – Friday, 9 a.m.-3 p.m. Median improvements under permit. Expect alternating northbound and southbound lane closures on Route 17 between Poplar Road and the entrance to the Cardinal Forest subdivision.
Route 17
Sunday – Thursday, 7 p.m.- 6 a.m. Mobile operation for pavement markings between Route 1 and Short Street.
Route 17 Southbound
Monday – Friday, 9 a.m.-3 p.m. Guardrail work. Single lane closure near Tensley Lane.
Route 610 at Aquia Creek Bridge
Monday – Friday, 9 a.m.-3 p.m. Guardrail work. Flagging crew will alternate one-way traffic at the Aquia Creek bridge.
Route 630 (Courthouse Road)
Sunday – Thursday, 7 p.m.- 6 a.m. Mobile operation for pavement markings between Hospital Center Boulevard and Austin Ridge Drive.
Route 648 (Shelton Shop Road)
Sunday – Thursday, 7 p.m.- 6 a.m. Mobile operation for pavement markings between Courthouse Road and Wolverine Road.
Route 652 (Truslow Road)
Monday – Friday, 9 a.m.-3 p.m. Milling and paving between Route 1 and Enon Road, as well as Berea Church Road and Poplar Road. Flaggers will alternate one-way traffic through the work zone.
Route 709 (Flatford Road)
Monday – Wednesday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Winding Creek Road and Ashbrook Road.
Route 751 (Hampton Park Road)
Monday – Friday, 9 a.m.-7 p.m. Pavement marking. Flagging crew will direct one-way, alternating traffic between Parkway Boulevard and Eustace Road.
Route 1264 (Parkway Boulevard)
Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct one-way, alternating traffic between Flatford Road and Route 610 (Garrisonville Road).
Brentwood Estates subdivision
Monday – Friday, 9 a.m.-7 p.m. Road resurfacing. Flagging crew will direct traffic on various routes for road resurfacing.
Spotsylvania County
I-95 Exit 126 Area Improvements
Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion is expected in Sept. 2027.
Route 620 (Harrison Road) Reconstruction and Widening
Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion expected in Sept. 2026.
Stafford County
Route 1 Bridge Replacement at Chopawamsic Creek
Construction is underway on a $13.9 million project to replace the four-lane Route 1 bridge over Chopawamsic Creek. The bridge is located just south of the Prince William County line and is near Quantico Marine Corps Base. Construction is expected to be complete in June 2028. Four travel lanes will remain open at most times during construction, with periodic lane closures needed during off-peak times as traffic is shifted to complete the bridge construction in phases.
Route 1 at Telegraph Road and Woodstock Lane
Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left turn lanes will be built from Telegraph Road onto Route 1 southbound. A left turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion in fall 2026. Visit the county project page.
Route 1 and Courthouse Road Intersection Improvement Project
Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion expected in summer 2027. Visit the county project page.
Route 644 (Rock Hill Church Road) Bridge Replacement
Route 644 (Rock Hill Church Road) is closed to replace the temporary single-lane structure over Aquia Creek with a two-lane bridge. Rock Hill Church Road will remain closed to through traffic between Dunbar Drive and Van Horn Lane with a detour in place until June 2027.
Commuting and Ridesharing Information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

















