;

Area road work this week

by | Jun 2, 2025 | Region, Ted Schubel, Transportation

Interstate 95 Northbound and Southbound

Exit 118 (Thornburg) to Exit 130 (Route 3)

Sunday, 10 p.m.-5 a.m. Alternating single and double lane closures between mile markers 125-127 for barrier installation. Single lane closures start at 10 p.m. and double lane closures start at 12 a.m.

Interstate 95 Northbound

Exit 118 (Thornburg) to Exit 126 (Spotsylvania)

Sunday – Thursday, 9 p.m.-4:30 a.m. Alternating lane closures between mile markers 121-126 for milling and paving mobile operation.

Exit 118 (Thornburg) to Exit 130 (Route 3)

Monday – Thursday, 9 p.m.-4 a.m. Alternating single and double lane closures between mile markers 125-127 for barrier installation. Single lane closures start at 9 p.m. and double lane closures start at 10 p.m.

Exit 140 (Courthouse Road) to 143 (Garrisonville Road)

Monday – Thursday, 9 p.m.-4:30 a.m. Alternating double lane closures for milling and paving between mile markers 140-142.

Exit 143 (Garrisonville Road) to Exit 148 (Quantico)

Wednesday – Thursday, 9 p.m. – 4:30 a.m. Alternating double lane closures for milling and paving between mile markers 146-147.

Interstate 95 Southbound

Exit 140 (Courthouse Road) to Exit 133 (Falmouth/Warrenton)

Monday – Friday, 8 p.m.-5 a.m. Single lane closure. Mobile pavement marking.

Exit 130 (Route 3) to Exit 118 (Thornburg)

Monday – Friday, 8 p.m.-5 a.m. Ends early Friday morning this week. Single lane closure for pavement marking work between mile markers 129-124.

Exit 130 (Route 3) to Exit 118 (Thornburg)

Monday – Thursday, 8 p.m.-5 a.m. Alternating single and double lane closures between mile markers 125-127 for barrier installation. Single lane closures start at 8 p.m. and double lane closures start at 10 p.m.

Exit 126 (Spotsylvania) Off-Ramp

Sunday – Saturday, 7 p.m.-10 a.m. Alternating single lane closures on the off-ramp to Route 1. Final construction activities to widen the ramp and build an additional right turn lane to Route 1 southbound.

Caroline County

Route 1

Monday – Friday, 8 a.m.-7 p.m. Alternating lane closures for milling and paving between Route 207 (Rogers Clark Boulevard) and Route 601 (Golansville Road).

Route 2 (Maint Street)

Closed to through traffic between Chase Street/Milford Street and Courthouse Lane for a town utility project through Monday, June 30, weather permitting. Route 2 travelers should follow the posted detour route using Route 207/Route 301 and East Broaddus Avenue.

View a Route 2 detour map. For updates on the status of the road closure and utility work, visit the Town of Bowling Green website.

Route 609 (Woodslane Road)

Monday – Friday, 9 a.m.-3 p.m. Road closed at the CSX railroad crossing between Route 626 (Woodford Road) and Route 629 (Minarchi Road). Traffic will be detoured during the daytime closure for work under permit.

Route 656 (Colemans Mill Road)

Monday – Wednesday, 9 a.m.-3 p.m. Road closed at the CSX railroad crossing between Route 684 (Dry Bridge Road) and Route 207 (Clark Patton Boulevard). Traffic will be detoured during the daytime closure for work under permit.

City of Fredericksburg

Bridgewater Street

Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures between Fall Hill Avenue and Wellford Street. Flaggers will direct traffic through the work zone.

Fall Hill Avenue

Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures between Route 1 and Bridgewater Street. Flaggers will direct traffic through the work zone.

Lafayette Boulevard

Wednesday – Friday, 7 a.m.-2 p.m., except for Friday, when all lanes will reopen by noon. Right lane closure on Lafayette Boulevard between Twin Lake Drive and St. Paul Street. Two travel lanes, with one lane open in each direction, will be maintained by slightly shifting vehicles traveling south into a dual turn lane.

King George County

Route 3 Westbound (Kings Highway)

Monday – Friday, 7 a.m.-5 p.m. Alternating lane closures for pavement marking work between Stafford/King George County line and Route 607 (Port Conway Road).

Secondary Road Resurfacing

Monday – Friday, 8 a.m.-5 p.m. Road resurfacing. A flagging crew will direct one-way, alternating traffic along the following routes:

Route 602 (Chapel Green Road) between Stafford County line and Route 603 (Fletchers Chapel Road)

Kitchen’s Point Subdivision

Monmouth Village Subdivision

Spotsylvania County

Route 1 at Arcadia Road

Monday – Friday, 9 a.m.-3 p.m. All travel lanes will remain open, but the alignment of the Route 1 travel lanes has shifted slightly between Arcadia Road and Mudd Tavern Road for road improvement work connected with the Kalahari Resorts & Conventions development. Permit work. Construction will also be underway along the road shoulder.

Route 1 at Southpoint Parkway

Sunday – Thursday, 7 p.m.-7 a.m. and Friday – Saturday, 10 p.m.-6 a.m. Alternating single lane closures on Route 1 between the I-95 southbound off-ramp and Southpoint Parkway. Final construction activities.

Route 1

Sunday, 10 p.m.-5 am, Monday – Thursday, 7:30 p.m.-5 a.m., and Friday, 11 p.m.-5 a.m. Flagging at the intersection of Route 1 and S. Roxbury Mill Road and Food Lion entrance for paving.

Route 2 (Tidewater Trail)

Monday – Friday, 9 p.m.-5 a.m. Single lane closure on Route 2 between Benchmark Road and Pierson Drive. Installation of water main under permit.

Route 3

Monday– Friday, 9 a.m.-3 p.m.Traffic signal work will be underway on Route 3 at multiple intersections throughout the week:

Route 3 and Gordon Road

Route 3 and Old Plank Road/Five Mile Road Extended

Route 3 and Single Oak Road/Chancellors Village Lane

Route 3 and Salem Church Crossing shopping center

Route 208 (Courthouse Road)

Monday – Friday, 9 a.m.-3 p.m.Traffic signal work will be underway on Route 208 at the Brittany Commons Boulevard and Breckenridge Drive intersection.

Route 608 (Massaponax Church Road)

Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Hickory Hill Drive and Summit Crossing Road with one-way, alternating traffic. Installation of water main under permit.

Route 610 (Old Plank Road)

Monday – Friday, 9 a.m.-3 p.m.Single lane closure between Lewis Thornburg Road and Pullen Drive with one-way, alternating traffic. Installation of a roundabout under permit.

Route 610 (Old Plank Road)

Tuesday – Friday, 9 a.m.-7 p.m. One-way alternating lane closures with flagging for milling and paving for trench widening work between Route 3 (Plank Road) and Route 612 (Catharpin Road).

Route 620 (Harrison Road)

Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Kingswood Boulevard and Salem Church Road/Leavells Road with one-way, alternating traffic. Installation of water main under permit. Click here for the Spotsylvania County project page.

Route 620 (Harrison Road)

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures between Old Plank Road and Gordon Road for road widening.

Route 628 (Smith Station Road)

Sunday – Thursday, 7 p.m.-6 a.m. Road resurfacing between Route 208 and Gordon Road. One-way, alternating traffic.

Route 629 (Foster Road)

Sunday – Thursday, 7 p.m.-6 a.m. Road resurfacing. One-way, alternating traffic.

Route 668 (Summit Crossing Road)

Monday – Wednesday, 9 a.m.-3 p.m. Road closed at the CSX railroad crossing between Route 2433 (Walnut Hill Drive) and Route 609 (Macedonia Road). Traffic will be detoured during the daytime closure for work under permit.

Route 690 (Peppertree Lane)

Monday – Friday, 8 a.m.-5 p.m. Road resurfacing. One-way, alternating traffic.

Route 711 (Southpoint Parkway)

Monday – Thursday, 9:30 a.m.-3:30 p.m. and Sunday– Saturday, 7:30 p.m.-5:30 a.m. Alternating single lane closures for final construction activities.

Route 620 (Spotswood Furnace Wood)

Monday – Thursday, 7:30 a.m. – 3:30 p.m. Road CLOSED between River Road and U.S. Ford Road for pavement repair. All traffic will be detoured to Route 3 and Elys Ford Road during the work zone hours. View an online detour map.

Route 1895 (Salisbury Drive)

Monday – Friday, 9 a.m.-3 p.m. Alternating one-way lane closure for guardrail removal near Route 208 (Courthouse Road).

Route 1964 (Ni River Landing)

Monday – Friday, 9 a.m.-3 p.m. Alternating one-way lane closure for guardrail removal near Route 627.

Pipe Run subdivision

Thursday, 9 a.m.-7 p.m. and Friday, 9 a.m.-4 p.m. Road resurfacing. One-way, alternating traffic.

Rivers Bluff subdivision

Monday – Friday, 8 a.m.-5 p.m. Road resurfacing. One-way, alternating traffic.

Sunset Harbour subdivision

Monday – Friday, 8 a.m.-5 p.m. Road resurfacing. One-way, alternating traffic.

Secondary Road Resurfacing

Wednesday – Friday, 8 a.m.-5 p.m. Road resurfacing. One-way, alternating traffic along the following routes:

Route 605 (Swift Road)

Route 623 (Margo Road)

Route 630 (Corene Road)

Route 650 (Margo Road)

Route 666 (Tribble Road)

Route 682 (Parker Lane)

Route 685 (Pritchett Road)

Route 718 (Hebron Church Road)

Route 728 (Wheeler Road)

Route 733 (Brokenburg Road)

Route 1775 (Post Lane)

Stafford County

Route 3 (Kings Highway)

Monday – Friday, 9 a.m.-3 p.m. Single lane closures between Route 607 (Cool Springs Road) and Route 3 (Blue and Gray Parkway). Fiber installation under permit.

Route 17 Southbound

Monday – Thursday, 9 a.m.-3 p.m. Intermittent right lane closures on southbound Route 17 between Village Parkway and Hartwood Church Road to install waterline and sewer line under permit.

Brooke Road

Monday – Thursday, 7 a.m.-4:30 p.m. One-way alternating lane closure with flaggers directing traffic through the work zone near Petty Lane for shoulder repair project.

Route 607 (Cool Springs Road)

Monday – Friday, 9 a.m.-3 p.m. Single lane closures between Route 3 Business and Route 218 (White Oak Road). Fiber installation under permit.

Route 610 (Garrisonville Road)

Sunday – Friday, 10 p.m.-5 a.m. Alternating lane closures between Route 1551 (Joyce Street) and Route 648 (Shelton Shop Road) for sewer line repair under permit.

Route 1968 (Celebrate Virginia Parkway)

Monday – Friday, 7 a.m.- 5 p.m. Alternating lane closures for pavement work.

Route 1969 (Banks Ford Parkway)

Monday – Friday, 7 a.m.- 5 p.m. Alternating lane closures for pavement work between Celebrate Virginia Parkway and Route 17.

Guardrail Removal

Monday – Friday, 9 a.m.-3 p.m. One-way alternating lane closure with flaggers directing traffic through the work zone for guardrail removal along the following routes:

Route 751 (Eustace Road)

Route 1630 (Lord Fairfax Drive)

Route 1707 South Gateway Drive

Pavement Work

Monday – Friday, 7 a.m.-5 p.m. Alternating lane closures on Route 654 (Banks Ford Parkway) and Route 1968 (Celebrate Virginia Parkway) for pavement work.

Westmoreland County

Route 612 (Antioch Road)

Monday – Friday, 8 a.m.-5 p.m. Road resurfacing between Route 3 and Nomini Hall Road. A flagging crew will direct one-way, alternating traffic through the work zone.

Route 638 (Ferry Landing Road)

Monday – Friday, 8 a.m.-5 p.m. Road resurfacing near Route 205. A flagging crew will direct one-way, alternating traffic through the work zone.

Route 785 (Industrial Park Drive)

Monday – Friday, 8 a.m.-5 p.m. Road resurfacing near Route 3. A flagging crew will direct one-way, alternating traffic through the work zone.

Route 799 (Poorhouse Road)

Monday – Friday, 8 a.m.-5 p.m. Road resurfacing near Panorama Road. A flagging crew will direct one-way, alternating traffic through the work zone.

Additional Projects in Fredericksburg District

Caroline County

Route 2 (Main Street) Closure in Town of Bowling Green

Main Street in the Town of Bowling Green in Caroline County is closed to through traffic between Chase Street/Milford Street and Courthouse Lane for a town utility project. Main Street will be closed until Monday, June 30, weather permitting. Route 2 travelers should follow the posted detour route using Route 207/Route 301 and East Broaddus Avenue.

Route 638 (South River Road) Bridge Replacement

Construction is underway to replace the Route 638 (South River Road) bridge over South River. A portion of South River Road is closed with a detour in place. The project will be complete by Sept. 2025.

City of Fredericksburg

Route 1 at Fall Hill Avenue, and

Route 1 at Princess Anne Street and Hanson Avenue

Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Construction will be complete by June 2026. Intermittent single lane and shoulder closures will be needed at times, but most lane closures will occur overnight, and outside of peak weekday commute times.

Lafayette Boulevard at Twin Lakes/Kensington

Construction is underway on a $2.4 million bicycle and pedestrian connector project. Most construction will occur on the road shoulders and outside of the travel lanes. The project will be complete by Nov. 2025.

Spotsylvania County

I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound

A second right turn lane is under construction from the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound is being widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is being added from Route 1 southbound to Southpoint Parkway. Traffic islands will be installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic exiting from side streets. Project completion is anticipated in June 2025.

Route 606 (Mudd Tavern Road) Widening

Mudd Tavern Road is being widened to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, is under construction parallel to Mudd Tavern Road and will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion was scheduled for late May 2025, but construction will continue into June 2025. Updates will be posted to the project page.

Route 620 (Harrison Road) Reconstruction and Widening

Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion late summer 2026.

Commuting and Ridesharing Information

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area, and is part of the George Washington Regional Commission.

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

Share This