I-95 Northbound

Exit 110 (Ladysmith) to Exit 118 (Thornburg)

Sunday – Thursday, 9 p.m. – 5:30 a.m. Varying single and double lane closures for installation of rumble stripes at mile markers 111-113 near exit 110 (Ladysmith).

Exit 118 (Thornburg) to Exit 126 (Spotsylvania)

Sunday – Thursday, 9 p.m. – 5:30 a.m. Varying single and double lane closures at mile markers 118-122 for milling, paving, pavement patching, and installation of rumble stripes.

Exit 130 (Route 3) to Exit 133 (Falmouth/Warrenton)

Sunday – Friday, 10 p.m. – 4:30 a.m. Double lane closure with intermittent traffic stops at mile markers 130-132 to install overhead signs for the I-95 Northbound Rappahannock River Crossing project.

  • 10 p.m. – Two lanes closed
  • Midnight – 3 a.m. Full intermittent traffic stops for up to 30 min. intervals
  • 4:30 a.m. – All lanes open

Exit 130 (Route 3) to Exit 133 (Falmouth/Warrenton)

Monday – Thursday, 9:30 a.m. – 3:30 p.m. Single lane closure to install overhead signs for the I-95 Northbound Rappahannock River Crossing project.

Exit 133 (Falmouth/Warrenton) to Exit 136 (Centreport Parkway)

Monday – Friday, 9 p.m. – 4:30 a.m. and Friday – Saturday, 10 p.m. – 7 a.m. Single lane closure to move work zone barrier for the 95 Express Lanes Fredericksburg Extension.

Exit 140 (Courthouse Road) to Exit 143 (Aquia/Garrisonville)

Monday – Thursday, 9:30 a.m. – 3:30 p.m. Single lane closure at mile markers 140-142. Construction for 95 Express Lanes Fredericksburg Extension.

I-95 Southbound

Exit 140 (Courthouse Road) to Exit 136 (Centreport Parkway)

Monday – Thursday, 9 p.m. – 10 a.m. and Thursday – Friday, 9 p.m. – 6 a.m. Varying single and double lane closures between mile markers 140-138 for 95 Express Lanes Fredericksburg Extension construction.

Exit 136 (Centreport Parkway) to Exit 133 (Route 17)

Monday, midnight – 10 a.m. and Monday – Thursday, 9 p.m. – 10 a.m. and Thursday – Friday, 10 p.m. – 6 a.m. Varying single and double lane closures at mile markers 135-134. Construction for 95 Express Lanes Fredericksburg Extension.

Exit 133 (Falmouth/Warrenton) Off-Ramps Closure and Detour

Sunday – Thursday, 11 p.m. –  4 a.m. I-95 southbound off-ramps to Route 17 northbound to Warrenton and Route 17 Business to Falmouth will close each evening with a detour. Drivers will be detoured to exit 136/Centreport Parkway to Route 1 to return to Route 17 Business/Route 17 or use alternate route depending on your destination. Construction for 95 Express Lanes Fredericksburg Extension.

Exit 133 (Falmouth/Warrenton) to Exit 130 (Route 3)

Monday – Thursday, 9 p.m. – 10 a.m. Single lane closure in the southbound through travel lanes between mile markers 132-130. Sign installation for I-95 Northbound Rappahannock River Crossing.

Exit 118 (Thornburg) to Exit 110 (Ladysmith)

Wednesday – Thursday, 9 p.m. – 5:30 a.m. Varying single and double lane closures at mile markers 117-116. Installation of rumble stripes.

Exit 110 (Ladysmith) Off-Ramp

Monday, 6 a.m. – 6 p.m. Due to paving activities, tractor-trailers or oversize trucks/vehicles will not be permitted to turn right from the I-95 southbound off-ramp at exit 110 (Ladysmith) to westbound Ladysmith Road during this 12-hour period. Left turns will be permitted, and trucks may proceed straight ahead to re-enter I-95 southbound.

Exit 118 (Thornburg) to Exit 104 (Carmel Church)

Sunday – Thursday, 9 p.m. – 5:30 a.m. Varying single and double lane closures for installation of rumble stripes at mile markers 112-108 near exit 110 (Ladysmith).

City of Fredericksburg

Route 1 and Route 3

Sunday – Thursday, 8 p.m. – 5 a.m. Mobile lane closures. Travelers may encounter brief overnight delays on Route 1 and Route 3 in the City of Fredericksburg as crews install pavement markings following recent paving. Work will be underway on Sunday through Thursday evening, ending early Friday morning.

Route 3

Sunday – Monday, 9 p.m. – 5 a.m. Mobile lane closures on Route 3 eastbound and westbound for pavement marking work between Gateway Boulevard and Carl D. Silver Parkway.

Stafford County

Route 1

Sunday – Monday, 9 p.m. – 5 a.m. Pavement marking. Mobile operation on Route 1 northbound and southbound between Layhill Road and Route 17.

Courthouse Road/Hospital Center Boulevard

Monday – Thursday, 9 a.m. – 3 p.m. and Friday, 9 a.m. – 2 p.m. Single lane closure between Route 1 and Austin Ridge Drive. Construction for 95 Express Lanes Fredericksburg Extension.

Eskimo Hill Road

Monday – Friday, 7 a.m. – 5 p.m. One-way, alternating traffic at bridge over CSX railroad. Bridge maintenance.

Old Courthouse Road

Monday – Thursday, 9:30 a.m. – 3 p.m. and Friday, 9:30 a.m. – 2 p.m. Single lane closure near Park and Ride commuter lots with one-way, alternating traffic directed by a flagging crew. Construction for 95 Express Lanes Fredericksburg Extension.

Truslow Road

Monday – Thursday, 9:30 a.m. – 3 p.m. and Friday, 9:30 a.m. – 2 p.m. Single lane closure near I-95 overpass with one-way, alternating traffic directed by a flagging crew. Paving. Construction for the 95 Express Lanes Fredericksburg Extension.

Stafford County and King George County

Route 218 (White Oak Road/Caledon Road)

Monday – Friday, 7 a.m. – 3 p.m. Flagging crew will direct alternating, one-way traffic on Route 218 (White Oak Road) between Route 604 (Belle Plains Road) in Stafford and Route 206 (Dahlgren Road) in King George County for a safety improvement project.

Spotsylvania County

Route 1 Southbound

Sunday – Saturday, 9 p.m. – 6 a.m. Single southbound lane closure on Route 1 between the intersections of Hood Drive and Market Street. Construction of road improvements under permit for future U.S. Veterans Health Administration clinic.

Route 3 Westbound

Sunday – Monday, 9 p.m. – 5 a.m. Mobile lane closures for pavement marking work on Route 3 westbound between Bragg Road and Chewing Road/Rutherford Drive.

Route 17 Southbound

Monday – Thursday, 9 a.m. – 3 p.m. Guardrail repair on Route 17 southbound, around 1.5 miles south of Route 2 intersection. Flagging crew will direct one-way, alternating traffic.

Hood Drive

Starting Wednesday, Oct. 25, one-way northbound traffic currently traveling from Route 1 to Courthouse Road along Hood Drive will be shifted to the left within the work zone along Hood Drive.

Southpoint Parkway

Sunday – Thursday, 8 p.m. – 6 a.m. Alternating lane closures with flagging for pavement marking on Southpoint Parkway between Route 208 and Route 1.

Monday – Thursday, 9 a.m. – 3:30 p.m. Single lane closure between Route 1 southbound and Pacific Drive. Bridge construction.

Route 607 (Guinea Station Road)

Monday – Friday, 9 a.m. – 7 p.m. Pothole patching between Route 1 and Caroline County line. Flagging crew will alternate one-way traffic through the work zone.

Route 608 (Massaponax Church Road)

Monday – Friday, 9 a.m. – 7 p.m. Pothole patching between Route 1 and Hickory Ridge Road. Flagging crew will alternate one-way traffic through the work zone.

Caroline County

Route 1

Sunday – Friday, 7 p.m. – 6 a.m. and Monday – Friday, 8 a.m. – 5 p.m. Route 1 northbound and southbound single lane closures for paving between Ladysmith Road and Collins Boulevard, and at the Route 1 and Ladysmith Road intersection.

Route 17

Monday – Friday, 7 a.m. – 3 p.m. Drainage cleaning operation. Mobile lane closures with one-way, alternating traffic between Mount Road and Ware Creek Road.

Route 639 (Ladysmith Road)

Sunday – Friday, 7 p.m. – 6 a.m. and Monday – Friday, 8 a.m. – 5 p.m. Lane shifts and shoulder closures on Ladysmith Road between Green Street and Allen Street for paving.

Essex County

Mobile Pavement Markings

Monday – Friday, 7 a.m. – 5 p.m. Mobile lane closures for pavement markings. Flagging crew will direct drivers through the following intersections:

  • Route 615 (Mussel Swamp Road) and Route 726 (Deep Landing Road)
  • Route 622 (Faucetts Road) and Route 621 (Midway Road)
  • Route 627 (Mount Landing Road) and Route 618 (Scotts Mill Road)
  • Route 627 (Mount Landing Road) and Route 628 (Fernlea Road)
  • Route 637 (Hustle Road) and Route 639 (Laurel Springs Road)
  • Route 684 (Howerton Road) and Route 611 (Johnville Road)
Gloucester County

Route 17 Business (Main Street)

Tuesday – Thursday, 9 p.m. – 5 a.m. Pavement marking. One-way, alternating traffic directed by a flagging crew between the Route 3/14 intersection and Route 619 (Fiddlers Green Road) intersection.

Wednesday – Friday, 9 a.m. – 3 p.m. One-way, alternating traffic directed by a flagging crew. Crews will be gathering soil samples on Main Street between Route 17 and Duval Avenue.

Mobile Pavement Markings

Monday – Friday, 7 a.m. – 5 p.m. Mobile lane closures for pavement markings. Flagging crew will direct drivers through the following intersections:

  • Route 605 and Route 1442 (Beasley Drive)
  • Route 606 (Ark Road) and Route 615 (E. Chestnut Fork Road)
  • Route 606 (Farys Mill Road) and Route 1110 (Forest Grove Drive)
  • Route 610 and Route 612 (Millers Landing Road)
  • Route 610 (Pinetta Road) and Route 610 (Davenport Road)
  • Route 614 (Hickory Fork Road) and Route 618 (Cappahosic Road)
  • Route 618 (Cappahosic Road) and Route 1342 (Poplar Pond Drive)
  • Route 623 and Route 624 (Griffin Road)
  • Route 628 and Route 629 (Paige Road)
  • Route 629 (T.C. Walker Road) and Route 626 (Zanoni Road)
  • Route 629 and Route 671 (Enfield Road) and Route 728 (Goshen Lane)
  • Route 632 (S Aberdeen Creek Road) and Route 1380 (Carters Cove Drive)
  • Route 632 and Route 1355 (Thompson Road)
  • Route 652 (Guinea Circle) and Route 651 (Browns Bay Road)
  • Route 1405 (Kitchener Drive) and Route 1422 (Founders Mill Way)
King and Queen County

Route 360 Eastbound

Monday – Friday, 7 a.m. – 7 p.m. Alternating lane closures at the bridge over the Mattaponi River. Bridge maintenance.

Mobile Pavement Markings

Monday – Friday, 7 a.m. – 5 p.m. Mobile lane closures for pavement markings. Flagging crew will direct drivers through the following intersections:

  • Route 610 (Coldwater Road) and Route 613 (Dabney Road)
  • Route 629 (Walkerton Landing Road) and Route 633 (Rose Mount Road)
  • Route 634 (Canterbury Road) and Rose Mt. Road
  • Route 628 (Spring Cottage Road) and Route 625 (Poplar Hill Road)
  • Route 631 (Poorhouse Road) and Route 617 (Providence Road)
  • Route 635 (Bradley Farm Road) and Route 633 (Indian Neck Road)
  • Route 635 (Elevon Road) and Route 627 (Mt. Landing Road)
  • Route 721 (Newton Road) and Route 640 (Lyneville Road)
  • Route 721 (Newton Road) and Route 660 (Sorghum Road.)
  • Route 721 (Newton Road) and Route 652 (Vessels Road)

King George County

Route 3

Wednesday – Thursday, 9 p.m. – 5 a.m. Mobile operation for pavement marking on Route 3 eastbound and westbound between the Stafford County line and Route 1214 (Hudson Lane).

Route 603 (Fletchers Chapel Road)

Monday – Friday, 7 a.m. – 7 p.m. One-way, alternating traffic directed by a flagging crew on Route 603 bridge over CSX railroad for maintenance work.

Pavement Markings

Monday – Friday, 7 a.m. – 5 p.m. Mobile lane closures with flagging for pavement marking work at the following intersections:

  • Route 3 with Route 610 (Indiantown Road)
  • Route 3 with Route 609 (Comorn Road)

King William County

Mobile Pavement Markings

Monday – Friday, 7 a.m. – 5 p.m. Mobile lane closures for pavement markings. Flagging crew will direct drivers through the following intersections:

  • Route 600 (W. River Road) and Route 603 (Dover Lane)
  • Route 606 (Commins Road) and Route 1216 (Newman Drive)
  • Route 608 (Upshaw Road) and Route 1135 (Parkwood Drive)
Lancaster County

Mobile Pavement Markings

Monday – Friday, 7 a.m. – 5 p.m. Mobile lane closures for sign installations and pavement marking. Flagging crew will direct drivers through the following intersections:

  • Route 600 and Route 617 (Alfonso Road)
  • Route 604 and Route 684 (Richtown Road)
  • Route 614 and Route 673 (Riverside Drive)
  • Route 622 and Route 751 (Creekside Drive)
  • Route 632 (Johns Neck Road) and Route 222 (Weems Road)
  • Route 646 and Route 670 (Ring Farm Road)
Mathews County

Mobile Pavement Markings

Monday – Friday, 7 a.m. – 7 p.m. Mobile lane closures for pavement markings and sign installations at various intersections on secondary routes in Mathews County. Flagging crew will direct drivers through the following intersections:

  • Route 600 (Circle Drive) and Route 655 (Dutchman’s Road)
  • Route 617 (N. River Road) and Route 654 (Gum Springs Road)
  • Route 625 (Tie Neck Road) and Route 660 (E. River Road)
  • Route 643 (Haven Beach Road) and Route 613 (Knight Wood Road)

Middlesex County

Mobile Pavement Markings

Monday – Friday, 7 a.m. – 7 p.m. Mobile lane closures for pavement markings. Flagging crew will direct drivers through the following intersections:

  • Route 623 (Regent Road) and Route 622 (Dirt Bridge Road)
  • Route 603 and Route 607 (Guinea Station Road)

Northumberland County

Route 360

Thursday – Friday, 9 a.m. – 5 p.m. Single lane closures. Pavement marking work. Between the intersections of Route 600 and Route 202, and between Route 647 and Route 653.

Mobile Pavement Markings

Monday – Friday, 7 a.m. – 5 p.m. Mobile lane closures for pavement markings. Flagging crew will direct drivers through the following intersections:

  • Route 600 and Route 616 (Luttrellville Lane)
  • Route 608 and Route 1205 (Clifton Landing Road)
  • Route 615 and Route 610 (Light Street)
  • Route 644 and Route 651 (Smith Point Road)
Westmoreland County

Route 3

Thursday – Friday, 9 a.m. – 5 p.m. One-way, alternating traffic. Pavement marking work on Route 3 between Asbury Road and Menokin Road.

Mobile Pavement Markings

Monday – Friday, 7 a.m. – 5 p.m. Mobile lane closures with one-way, alternating traffic. A flagging crew will direct traffic through the work zone at the following intersections:

  • Route 633 (Holly Vista Drive) with Route 1327 (Alma Lane)
  • Route 600 (Nomini Hall Road) with Route 614 (Weldons Drive)

Additional Projects in Fredericksburg District

 

Caroline County

Route 1 over South River Bridge Rehabilitation

Construction started in Feb. 2023 on a $4 million project to rehabilitate the Route 1 bridge over the South River, which is located in the Ladysmith area. The condition of the 97-year-old bridge will be improved through substructure and superstructure repairs, and installation of a new, smoother travel surface. Route 1 is reduced to two lanes to accelerate construction. Project completion in July 2024.

Route 639 (Ladysmith Road) Widening

Construction is underway to widen Route 639 (Ladysmith Road) to four lanes between I-95 and just west of Route 1. A new raised median will separate eastbound and westbound lanes to allow for improved movement through the corridor. Additional left and right turn lanes will be built on Ladysmith Road at the Route 1 intersection. A shared use path, sidewalks, crosswalks, and pedestrian crossing equipment will be installed. Project completion in May 2024.

King George County

Route 301 and the Nice-Middleton Bridge Replacement Project

The new Nice/Middleton Bridge is now open to traffic over the Potomac River. Road work continues on Route 301 near the approaches. Read MDTA’s release here.

King and Queen County and King William County

Route 628 (Dorrell Road/Spring Cottage Road) Bridge Closure

Dorrell Road/Spring Cottage Road is closed at the bridge over the Mattaponi River, located at the King and Queen and King William county line. The road will remain closed until spring 2025 while a bridge superstructure replacement project is designed and constructed. During a routine inspection, crews identified significant deterioration in key bridge elements and the bridge was closed in March 2023 for motorist safety. Motorists should follow signs posted along the detour route.

King William County

Route 629 (Jacks Creek Road)

A portion of Jacks Creek Road is closed through Jan. 2024 for the installation of a concrete box culvert. The project is replacing the existing culvert, which consists of three corrugated metal drainage pipes built in 1943. A detour is in place.

Richmond County

Route 637 (County Bridge Road)

County Bridge Road is closed to through traffic at the bridge over Cat Point Creek due to damage following heavy rain and flooding in summer 2021. A bridge replacement is under construction. County Bridge Road will remain closed to through traffic until the new bridge reopens by April 2024.

Spotsylvania County

I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound

A second right turn lane is under construction from the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound is being widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is being added from Route 1 southbound to Southpoint Parkway. Traffic islands will be installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic exiting from side streets. Additional right turn lane added to Southpoint Parkway to Route 1 southbound. Project completion in Aug. 2025.

Route 1 and Market Street

Construction is underway to build triple left turns from westbound Market Street to Route 1 southbound, with a fourth lane on Market Street becoming a shared through/right turn lane. A shared through/right turn lane on Route 1 southbound at the intersection will tie into the I-95 northbound on-ramp at exit 126, south of the intersection. New sidewalks will be added along westbound Market Street, on Route 1 southbound, and along a short area on Route 1 northbound. Crosswalks will span Market Street and Route 1, controlled by pedestrian crossing signal equipment. Project completion in Dec. 2023.

Route 3 and Orange Plank Road

Construction is underway to modify the intersection of Route 3 and Orange Plank Rd. to a new traffic pattern to enhance safety, improve traffic flow, and reduce conflict points. Project completion in late fall 2023.

Route 17 (Mills Drive) Overpass Replacement and Widening

Construction started in Dec. 2020 to replace the existing two-lane interstate overpass on Route 17 with a four-lane bridge. Route 17 is being widened to four lanes until just east of the Hospital Boulevard/Germanna Point Drive intersection. A shared-use path, sidewalk, and pedestrian crossing equipment will be added as part of the project. Project completion in Feb. 2024.

Route 208 (Courthouse Road) and Hood Drive

Hood Drive is reduced to a single lane between Route 1 and Route 208 (Courthouse Road), carrying only northbound traffic. Southbound traffic should follow the posted detour along Courthouse Road and Route 1 southbound. New right and left turn lanes are under construction at an entrance to a future U.S. Veterans Health Administration outpatient clinic. Additional turn lanes will be built on northbound Hood Drive approaching Courthouse Road. A raised median on Hood Drive will separate northbound and southbound traffic between Courthouse Road and McGowan Drive. Additional sidewalks, crosswalks, and pedestrian crossing equipment will be installed at the intersection. Project completion in June 2024.

Route 606 (Mudd Tavern Road) Widening

Mudd Tavern Road is being widened to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, will be built parallel to Mudd Tavern Road, and will connect with South Roxbury Mill Road and Dan Bell Lane. Route 606 (Mudd Tavern Road/Morris Road) is reduced to a single lane approaching the traffic signal at the Route 1 intersection through spring 2024 to allow space for widening activities. Project completion in May 2025.

Westmoreland County

Route 621 (North Tidwells Road) Bridge Replacement

North Tidwells Road is closed for a bridge replacement project over an unnamed tributary of the Lower Machodoc Creek. The road will be closed to traffic at the bridge until Jan. 2024. The project is replacing an existing timber deck bridge with a new concrete structure on concrete abutments and piles. Vehicles of all legal weights will be able to cross the new bridge. A detour route is posted.

Route 658 (Monroe Bay Circle)

Monroe Bay Circle is reduced to a single travel lane with a temporary bridge spanning Monroe Creek. A temporary traffic signal is directing one-way, alternating traffic. The bridge is a temporary measure to maintain traffic flow while a bridge replacement project is advanced.

Commuting and Ridesharing Information

 

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area, part of the George Washington Regional Commission.

 

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

Subscribe To Daily News Updates

Join our mailing list to receive the latest news from The Free Press

You have Successfully Subscribed!

Share This