Interstate 95 Southbound
Exit 140 (Courthound Road) to Exit 136 (Centreport Parkway)
Sunday – Thursday, 9 p.m.- 4:30 a.m. Alternating lane closures at mile markers 139-136 for milling and paving.
Interstate 95 Northbound
Exit 110 (Ladysmith) to Exit 118 (Thornburg)
Sunday – Thursday, 9 p.m.-5 a.m. Alternating lane closures at mile markers 110-111 for rumblestrip installation and pavement markings.
Exit 118 (Thornburg) to Exit 126 (Spotsylvania)
Monday – Thursday, 9 p.m.- 4:30 a.m. Alternating lane closures at mile markers 121-126 for rumblestrip installation and pavement markings.
Interstate 95 Northbound and Southbound
Bridge Washing
Monday – Saturday, 7 p.m.- 7 a.m. Mobile operation with alternating lane closures at various bridges in Caroline, Spotsylvania and Stafford counties for bridge washing.
Caroline County
Route 2
Monday – Friday, 8 a.m.-8 p.m. One-way, alternating traffic between Route 207 (Rogers Clark Boulevard) and the Spotsylvania County line. Shouldestone and rublestrip placement.
Route 17
Monday – Friday, 8 a.m.-8 p.m. Alternating lane closures on Route 17 between the bridge over Mount Creek and Pepmeier Hill Road for milling and paving.
Route 207 (Rogers Clark Boulevard)
Sunday – Thursday, 8 p.m. – 5 a.m. Alternating lane closures on eastbound Route 207 over Polecat Creek for repairs.
Route 301
Monday – Friday, 8 a.m.-8 p.m. Alternating lane closures for pavement marking work between just south of the Route 17 intersection and the south end of the Rappahannock River bridge.
Route 301 Southbound
Monday – Friday, 8 a.m.-8 p.m. Alternating lane closures for pavement marking work between Route 17 (Tidewater Trail) and A.P. Hill.
Monday – Friday, 8 a.m.-8 p.m. Alternating lane closures for pavement marking work between Fort Walker and south end bridge over Campbell Road.
Route 639 (Ladysmith Road)
Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Miss Clara Lane and Bridlewood Lane. Installation of a turn lane in support of a new residential development, under permit.
Bridge Washing
Monday – Saturday, 7 p.m.-7 a.m. Mobile lane closures for bridge washing, which removes debris to protect bridge condition and prevent deterioration. Bridge washing will occur along the following routes:
• Route 17
• Route 207
• Route 301
• Route 601
• Route 605
• Route 626
• Route 632
• Route 639
• Route 647
• Route 652
• Route 654
• Route 722
City of Fredericksburg
Route 1 Southbound
Sunday – Friday, 9 p.m.- 5 a.m. Right lane and shoulder closures between Charles Street and Fall Hill Avenue for road widening work.
Fall Hill Avenue
Monday – Friday, 9 a.m.-3 p.m. Right lane, turn lane, and shoulder closures between Bridgewater Street and Route 1 for road widening work.
Spotsylvania County
Route 1
Monday – Friday, 9 a.m.-3 p.m. Single northbound and southbound lane closures and shoulder closures between Spotsylvania Parkway and Massaponax Church Road. Fiber installation under permit.
Route 1 Southbound
Monday – Friday, 9 a.m.-3 p.m. Single southbound lane closures and shoulder closures between Mudd Tavern Road/Morris Road in Spotsylvania and Ladysmith Road in Caroline. Fiber installation under permit.
Route 1 Southbound
Monday – Friday, 9 p.m.-5 a.m. Single southbound lane closures and shoulder closures between Guinea Station Road and Mudd Tavern Road/Morris Road. Gas main installation work under permit.
Route 2/17 (Tidewater Trail)
Monday – Thursday, 9 p.m.-5 a.m. Lane closure between Benchmark Road and Pierson Drive. Water main installation work under permit.
Monday – Friday, 9 a.m.-3:30 p.m. Mobile lane closures for pavement marking work between Route 1320 (Powell Street) and the City of Fredericksburg line.
Route 208 (Courthouse Road)
Sunday – Monday, 7 p.m.-6 a.m. and Monday – Thursday, 8 p.m.-6 a.m. One-way alternating lane closures for milling and paving. Flaggers will direct traffic through the work zone. Read the release.
Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures for traffic signal work at Brittany Commons Boulevard and Breckenridge Drive.
Monday – Friday, 9 a.m.-3 p.m. Intermittent lane and shoulder closures between Southpoint Parkway and Leavells Road. Fiber install under permit.
Monday – Tuesday, 8 a.m.-5 p.m. Single lane closure for road widening work between Route 628 (Smith Station Road) and Route 1401 (Wild Turkey Drive).
Route 606 (Mudd Tavern Road)
Sunday, 6 p.m.-5 a.m. Alternating lane closures between I-95 and roundabout for final construction activities.
Route 610 (Old Plank Road)
Monday – Friday, 9 a.m.-3 p.m. Road widening work between Gordon Road and Ziyad Drive. Flaggers will alternate one-way traffic through the work zone.
Route 636 (Mine Road)
Monday – Friday, 9 a.m.-3 p.m. Intermittent lane and shoulder closures between Route 638 (Lansdowne Road) and Route 608 (Benchmark Road). Fiber install under permit.
Route 639 (Leavells Road)
Monday – Friday, 9 a.m.-3 p.m. Intermittent lane and shoulder closures between Courthouse Road and Harrison Road. Fiber install under permit.
Route 711 (Southpoint Parkway)
Monday – Friday, 9 a.m.-3 p.m. Intermittent right lane closure between Courthouse Road and Route 1. Fiber install under permit.
Harrison Road
Monday – Friday, 9 a.m.-3 p.m. Road widening work between Gordon Road and Old Plank Road. Flaggers will alternate one-way traffic through the work zone.
Route 2092
Sunday, 6 p.m.-5 a.m. Single lane closure for final paving work.
Bridge Washing
Monday – Saturday, 7 p.m.-7 a.m. Mobile lane closures for bridge washing, which removes debris to protect bridge condition and prevent deterioration. Bridge washing will occur in areas along the following routes:
• Route 1
• Route 3
• Route 17
• Route 208
• Route 607
• Route 608
• Route 612
• Route 620
• Route 628
• Route 632
• Route 646
• Route 656
• Route 719
• Route 738
Mobile Pavement Marking: Secondary Roads
Monday – Friday, 9 a.m.-3:30 p.m. Mobile lane closures will be underway on numerous secondary roads throughout Spotsylvania to refresh pavement markings, which are routes numbered 600 and above.
Traffic Signal Work
Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures with flagging in the following intersections:
• Route 3 at the intersection with Route 610 (Old Plank Road) and Route 675 (Five Mile Road)
• Route 3 at the intersection with Route 688 (Single Oak Road) and Chancellor Village Road
• Route 3 at the intersection with Route 627 (Gordon Road)
• Route 3 at the intersection with the entrance to Chancellor Center and Salem Church Crossing
• Route 627 (Gordon Road) and Route 674 (Chancellor Road)
Stafford County
Route 3 (Kings Highway)
Monday – Friday, 9 a.m.- 3 p.m. Single eastbound and westbound lane closures and shoulder closures between Cool Springs Road and Leonard Road. Fiber installation under permit.
Monday – Thursday, 8 p.m.-5 a.m. Single eastbound and westbound lane closures and shoulder closures between Leonard Road and Forest Lane Road. Fiber installation under permit.
Route 17
Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Sanford Drive/South Gateway Drive and Falls Run Drive. Median improvements under permit.
Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Poplar Road and Hartwood Church Road. Median improvements under permit.
Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Hartwood Church Road and the Fauquier County line. Fiber installation under permit.
Route 218 (Butler Road)
Monday – Thursday, 8 p.m.-5 a.m. Single lane closures and shoulder closures between Cool Springs Road and Route 1. Fiber installation under permit.
Route 624 (Barrett Heights Road)
Sunday – Thursday, 8 p.m.-6 a.m. Alternating lane closures with flagging for pavement marking work between Garrisonville Road and Onville Road.
Route 641 (Onville Road)
Sunday – Thursday, 8 p.m.-6 a.m. Alternating lane closures with flagging for pavement marking work between Aquia Creek bridge and Garrisonville Road.
Route 614 (Telegraph Road)
Sunday – Thursday, 8 p.m.-6 a.m. Mobile lane closures for milling and paving between Route 1 south side and Route 1 north side.
Greenspring Drive
Monday – Friday, 9 a.m.-7 p.m. Alternating lane closures with flagging for pavement marking work between end of state maintenance and Route 684 (Mine Road).
Salisbury Drive
Monday – Friday, 9 a.m.-7 p.m. Alternating lane closures with flagging for pavement marking work between Route 679 (Greenspring Drive) and Route 610 (Garrisonville Road).
Staffordboro Boulevard
Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures between Pike Place and Crater Lane for roadway construction.
Mobile Pavement Marking: Secondary Roads
Wednesday – Friday, 9 a.m.- 3:30 p.m. Mobile lane closures will be underway on various secondary roads throughout Stafford to refresh pavement markings, which are routes numbered 600 and above.
Bridge Washing
Monday – Saturday, 7 p.m.-7 a.m. Mobile lane closures for bridge washing, which removes debris to protect bridge condition and prevent deterioration. Bridge washing will occur in areas along the following routes:
• Route 1
• Route 3
• Route 17
• Route 610
• Route 626
• Route 627
• Route 651
• Route 684
• Route 753
Mobile Pavement Marking: Secondary Roads
Monday – Friday, 9 a.m.-3:30 p.m. Mobile lane closures will be underway on numerous secondary roads throughout Stafford to refresh pavement markings, which are routes numbered 600 and above.
Westmoreland County
Mobile Pavement Marking
Monday – Friday, 9 a.m.-3:30 p.m. Mobile lane closures will be underway to refresh pavement markings along Route 3 and Route 347.
Additional Projects in Fredericksburg District
Caroline County
Route 207 Northbound Bridge Rehabilitation
Construction is underway to improve the northbound Route 207 (Rogers Clark Boulevard) bridge over the Mattaponi River. The project will replace steel plate girders, concrete deck, railing, bridge approaches, and make substructure repairs. Work is expected to be complete in April 2026.
City of Fredericksburg
Route 1 at Fall Hill Avenue, and
Route 1 at Princess Anne Street and Hanson Avenue
Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Construction will be complete by June 2026. Intermittent single lane and shoulder closures will be needed at times, but most lane closures will occur overnight, and outside of peak weekday commute times.
Spotsylvania County
I-95 Exit 126 Area Improvements
Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion in Sept. 2027.
Route 606 (Mudd Tavern Road) Widening
Four travel lanes are now open on Mudd Tavern Road between I-95 and Route 1. A new secondary access route, Route 2092, remains under construction parallel to Mudd Tavern Road and will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion was scheduled for late May 2025, but final construction activities continue. Updates will be posted to the project page.
Route 620 (Harrison Road) Reconstruction and Widening
Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion in late summer 2026.
Commuting and Ridesharing Information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.