Area road work this week

by | Mar 9, 2026 | Region, Ted Schubel, Transportation

Interstate 95 Northbound and Southbound

Exit 118 (Thornburg) to Exit 126 (Spotsylvania)

Tuesday – Thursday, 9 a.m.-3 p.m. Mobile double lane closures for soil sampling work between mile markers 119-120.

Interstate 95 Northbound

Exit 126 (Spotsylvania) Off-Ramp to Route 1 Southbound

Monday – Friday, 10 p.m.-4 a.m. The off-ramp from I-95 northbound to Route 1 southbound at exit 126B in Spotsylvania will close nightly on Monday, March 9, through early Friday, March 13. The off-ramp will close nightly at 10 p.m. and reopen by 4 a.m. Northbound I-95 motorists should use the most convenient alternate interchange, either exit 118 (Thornburg) or exit 130 (Route 3). Construction work for exit 126 improvements.

Caroline County

Route 1

Monday – Friday, 9 a.m.-3 p.m. Single lane closures between Route 639 (Ladysmith Road) and Route 207 (Rogers Clark Boulevard). Utility work under permit.

Route 17

Monday – Friday, 8 a.m.-7 p.m. Alternating lane closures with flagging between Essex County line and Route 301 (A.P. Hill Boulevard). Milling and paving.

Sign Work, Multiple Routes

Monday – Friday, 7 a.m.-5 p.m. One-way, alternating traffic for mobile sign work on the following routes:

Route 601 (Reedy Mill Road)
Route 601 (Mount Vernon Church Road)
Route 640 (Smoots Road)
Route 640 (Maracossic Drive)
Route 652 (Riva Ridge Road)
Route 721 (Sparta Road)
City of Fredericksburg

Route 1 Northbound and Southbound, Falmouth Bridge Area

Thursday – Friday, 10 p.m.-6 a.m. Overhead sign removal. Expect alternating lane closures on Route 1 northbound and southbound on Falmouth Bridge and the Princess Anne Street/Hanson Avenue intersection between 10 p.m. and midnight Thursday, followed by intermittent full traffic stops for up to 15-minute intervals between midnight and 6 a.m. Friday morning. Traffic will be stopped to allow crews to remove an overhead sign. Emergency vehicles will be permitted through the work zone and across the Falmouth Bridge. If an additional night of work is needed, lane closures will begin again at 10 p.m. Friday, March 13, with intermittent 15-minute full traffic stops between midnight and 6 a.m. Saturday, March 14. Read the release.

Route 1 Northbound

Wednesday – Friday, 10 a.m.-2 p.m. Right turn lane closure on Route 1 northbound at Fall Hill Avenue. Intersection improvement project.

Fall Hill Avenue

Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures on Fall Hill Avenue between Bridgewater Street and Wallace Street. Intersection improvement project.

Princess Anne Street

Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures on Princess Anne Street between Route 1 and Amaret Street. Intersection improvement project.

King George County

Route 3 Westbound

Monday – Friday, 9 a.m.-3:30 p.m. Single lane closure for guardrail installation near Route 606 (Rokeby Lane).

Spotsylvania County

Route 1

Monday – Friday, 9 a.m.-3 p.m. Single lane closures and shoulder closures between Mudd Tavern Road/Morris Road in Spotsylvania and Ladysmith Road in Caroline. Fiber installation under permit.

Route 1 Northbound

Sunday – Thursday, 9 p.m.-5 a.m., and Monday – Friday, 9 a.m.-2 p.m. The right lane on Route 1 northbound will be closed between Southpoint Parkway and the I-95 southbound on-ramp. Construction for I-95 exit 126 area improvements.

Route 1 Southbound

Thursday – Friday, 9 p.m.-5 a.m. Single lane closure between Market Street and I-95 northbound on-ramp with police directing traffic for signal work as part of the construction for I-95 exit 126 area improvements.

Route 3 (Plank Road)

Sunday – Thursday, 9 p.m.-6 a.m. Guardrail installation on Route 3 near Glade Drive. Single lane closure.

Route 3 Eastbound and Westbound

Monday – Friday, 9 a.m.-3 p.m. Route 3 shoulder closures with intermittent lane closures between Route 627 (Gordon Road) and Route 20 (Constitution Highway). Fiber installation under permit.

Route 208 (Courthouse Road)

Sunday – Thursday, 9 p.m.-6 a.m. Guardrail installation on Route 208 near Breckenridge Drive. Single lane closure.

Route 620 (Harrison Road)

Monday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic. Road widening between Gordon Road and Old Plank Road.

Route 627 (Gordon Road)

Sunday – Thursday, 9 p.m.-5 a.m. Alternating lane closures at Route 610 (Old Plank Road) for signal work.

Route 636 (Mine Road)

Monday – Friday, 9 a.m.-3 p.m. Intermittent lane and shoulder closures between Benchmark Road and Lee Drive extended. Fiber installation under permit.

Route 639 (Leavells Road)

Monday – Friday, 9 a.m.-3 p.m. Flagging operation between Route 628 (Smith Station Road) and Route 748 (Three Cedars Lane). Tipperary Trail realignment work under permit.

Mallard Road

Sunday – Tuesday, 9 p.m.-5 a.m. Single lane closure at the I-95 northbound on/off ramp at exit 118 (Thornburg) for signal work.

Loriella Park subdivision

Monday – Friday, 9 a.m.-7 p.m. Mobile lane closures on multiple routes for pavement patching, ahead of upcoming secondary road resurfacing.

Road Resurfacing

Monday – Friday, 9 a.m.-5 p.m. Flagging crews will direct one-way, alternating traffic on numerous secondary roads for road resurfacing using cape seal treatment:

Route 1780 (Grantwood Drive)
Route 1781 (Sharon Road)
Route 1782 (Kenny Lane)
Route 1783 (Christina Court)
Route 1792 (Rensselaer Court)
Route 1796 (Emma Drive)
Route 1880 (Patrician Court)
Route 1881 (Willow Pond Drive)
Stafford County

Route 1 Northbound and Southbound

Tuesday – Friday, 7 p.m.-5 a.m. Mobile single lane closures between Arcadia Street and Corporate Road for traffic signal inspections.

Route 1

Sunday – Thursday, 9 p.m.-6 a.m. Single lane closures for guardrail installation along Route 1 northbound or southbound in the following areas:

Route 1 northbound (Cambridge Street) near Route 624 (Morton Road/Forbes Street)
Route 1 northbound (Richmond Highway) at Accokeek Creek
Route 1 southbound (Richmond Highway) near Route 628 (American Legion Road/Eskimo Hill Road)
Route 1 southbound (Richmond Highway) near Centreport Parkway

Route 1

Monday – Friday, 9 a.m.-3 p.m. Single lane closures on Route 1 northbound and southbound between Corporate Drive and Russell Road in Prince William County. Construction for bridge replacement over Chopawamsic Creek.

Route 17

Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Poplar Road and Hartwood Church Road. Median improvements under permit.

Route 17 Business (Warrenton Road)

Sunday – Thursday, 9 p.m.-6 a.m. Single lane closures for guardrail installation on Route 17 Business near Melcher Drive/Washington Street.

Route 610 (Garrisonville Road)

Tuesday – Friday, 7 p.m.-5 a.m. Mobile single lane closures between Keystone Street and Onville Road for signal inspections.

Signal Work

Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures for signal work along various intersections in Stafford County:

Route 1 at Corporate Drive
Route 1 at Acadia Street
Route 1 at Port Aquia Drive/Entrance to Saint William of York Church
Route 1 at Hospital Center Boulevard
Route 1 at Centreport Parkway
Route 17 (Warrenton Road) at Route 1015 (Lendall Lane/Solomon Drive)
Centreport Parkway at I-95 southbound on/off-ramp
Courthouse Road at I-95 northbound off-ramp
Courthouse Road at I-95 southbound on/off-ramp
Courthouse Road at Austin Ridge Road
Westmoreland County

Route 638 (Ferry Landing Road)

Monday – Friday, 9 a.m.-3:30 p.m. One-way, alternating traffic for guardrail installation near Route 205.

Additional Projects in Fredericksburg District

Caroline County

Route 207 Northbound Bridge Rehabilitation

Construction is underway to improve the northbound Route 207 (Rogers Clark Boulevard) bridge over the Mattaponi River. The project will replace steel plate girders, concrete deck, railing, bridge approaches, and make substructure repairs. Northbound Route 207 traffic is diverted to cross the Mattaponi River using the Route 207 southbound bridge, with one travel lane open in each direction. During the closure, Route 207 northbound will remain closed until the completion of the project. Work is expected to be complete in June 2026.

City of Fredericksburg

Route 1 at Fall Hill Avenue, and

Route 1 at Princess Anne Street and Hanson Avenue

Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Construction will be complete by June 2026. Intermittent single lane and shoulder closures will be needed at times, but most lane closures will occur overnight, and outside of peak weekday commute times.

Spotsylvania County

I-95 Exit 126 Area Improvements

Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion in Sept. 2027.

Route 620 (Harrison Road) Reconstruction and Widening

Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion in late summer 2026.

Stafford County

Route 1 Bridge Replacement at Chopawamsic Creek

Construction is starting in March 2026 on a $13.9 million project to replace the four-lane Route 1 bridge over Chopawamsic Creek. The bridge is located just south of the Prince William County line and is near Quantico Marine Corps Base. Construction will be completed in June 2028. Four travel lanes will remain open at most times during construction, with periodic lane closures needed during off-peak times as traffic is shifted to complete the bridge construction in phases.

Route 1 at Telegraph Road and Woodstock Lane

Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left turn lanes will be built from Telegraph Road onto Route 1 southbound. A left turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion in fall 2026. Visit the county project page.

Route 1 and Courthouse Road Intersection Improvement Project

Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion in summer 2027. Visit the county project page.

Commuting and Ridesharing Information

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

Share This