I-95 Northbound and Southbound
Exit 110 (Ladysmith) and Exit 118 (Thornburg)
Sunday – Saturday, 7 p.m.-7 a.m. Bridge washing. Mobile operation with alternating lane closures at the bridge over the Matta River.
Exit 130 (Route 3) and Exit 133 (Falmouth/Warrenton)
Sunday – Saturday, 7 p.m.-7 a.m. Bridge washing. Mobile operation with alternating lane closures in the local and through lanes at the I-95 bridges over the Rappahannock River.
Caroline County
Route 1
Monday – Friday, 9 a.m.-3 p.m. Single lane closures between Route 639 (Ladysmith Road) and Route 207 (Rogers Clark Boulevard). Utility line work under permit.
Route 2
Monday – Friday, 8 a.m.-8 p.m. Alternating lane closures with flagging for rumblestrip and pavement marking work between Route 207 Business and Spotsylvania/Caroline County line.
Route 17
Monday – Friday, 8 a.m.-8 p.m. Alternating lane closures with flagging for rumblestrip and pavement marking work between the north end of the bridge over Mount Creek and Route 610 (Pepmeier Hill Road).
Route 207 (Rogers Clark Boulevard) Eastbound
Monday – Friday, 9 a.m.-3:30 p.m. Single lane and shoulder closure for guardrail work near Polecat Creek.
Route 301 (Richmond Turnpike) Northbound
Monday – Friday, 9 a.m.-3:30 p.m. Single lane and shoulder closure for guardrail work near Route 695.
Pavement Marking: Primary Roads
Monday – Friday, 8 a.m.-8 p.m. Mobile lane closures will be underway on several primary roads throughout Caroline County to refresh pavement markings:
Route 1
Route 30
Route 301
Pavement Marking: Secondary Roads
Monday – Friday, 9 a.m.-3:30 p.m. Mobile lane closures will be underway on numerous secondary roads throughout Caroline County to refresh pavement markings, which are routes numbered 600 and above.
Caroline County and King George County
Route 301 over Rappahannock River
Sunday – Saturday, 7 p.m.-7 a.m. Bridge washing. Mobile operation with alternating lane closures.
Route 1 Northbound and Southbound
Sunday – Friday, 9 p.m.-5 a.m. and Monday – Friday, 10 a.m.-2 p.m. Right lane and shoulder closures on Route 1 between Charles Street and Fall Hill Avenue for road widening work.
Route 3 (Blue and Gray Parkway)
Sunday – Thursday, 8 p.m.-5 a.m. Milling and paving. Alternating lane closures on Route 3 between just west of the Lafayette Boulevard intersection and the bridge over CSX railroad.
Fall Hill Avenue
Monday – Friday, 9 a.m.-3 p.m. Right lane, turn lane, and shoulder closures between Bridgewater Street and Route 1 and between Route 1 and Wallace Street for road widening work.
King George County
Bridge Washing: Route 218 over Machodoc Creek
Sunday – Saturday, 7 p.m.-7 a.m. Bridge washing. Mobile operation with alternating lane closures.
Pavement Marking: Route 218
Monday – Friday, 9 a.m.-3:30 p.m. Mobile lane closures will be underway on Route 218 in King George County to refresh pavement markings.
Pavement Marking: Secondary Roads
Monday – Friday, 9 a.m.-3:30 p.m. Mobile lane closures will be underway on numerous secondary roads throughout King George County to refresh pavement markings, which are routes numbered 600 and above.
Spotsylvania County
Route 1 Northbound
Monday – Friday, 9 a.m.-3 p.m. Single northbound lane closures and shoulder closures between Massaponax Church Road and Spotsylvania Parkway. Fiber installation under permit.
Monday – Friday, 9 a.m.-3 p.m. Single southbound lane closures and shoulder closures between Mudd Tavern Road/Morris Road in Spotsylvania and Ladysmith Road in Caroline. Fiber installation under permit.
Monday – Friday, 9 p.m.-5 a.m. Single southbound lane closures and shoulder closures between Guinea Station Road and Mudd Tavern Road/Morris Road. Gas main installation work under permit.
Route 2/17 (Tidewater Trail)
Monday – Thursday, 9 p.m.-5 a.m. Lane closure between Benchmark Road and Pierson Drive. Water main installation work under permit.
Route 3 Eastbound and Westbound
Monday – Friday, 9 a.m.-3 p.m. Route 3 shoulder closures with intermittent lane closures between Route 627 (Gordon Road) and Route 20 (Constitution Highway). Fiber installation under permit.
Route 3 Westbound
Monday – Thursday, 9 a.m.-3:30 p.m. and Friday, 9 a.m.-Noon. Single lane and shoulder closure near the intersection of Route 621 for guardrail work.
Route 208 (Courthouse Road)
Sunday – Thursday, 8 p.m.-6 a.m. Final paving activities and rumblestrip placement. Flaggers will alternate one-way traffic on Route 208 between Lawyers Road and Lake Anna Bridge.
Monday – Friday, 9 a.m.-3 p.m. Temporary line striping. Flaggers will alternate one-way traffic on Route 208 between Lawyers Road and Lake Anna Bridge.
Monday, 8 a.m.-5 p.m. Pavement marking work. Single lane and shoulder closure between Wild Turkey Run and Smith Station Road.
Route 613 (Brock Road)
Tuesday, 8 a.m.-5 p.m. Shoulder widening work between Lake Anna Parkway and Gordon Lane. Flaggers will alternate one-way traffic through the work zone.
Route 636 (Mine Road)
Monday – Friday, 9 a.m.-3 p.m. Intermittent lane and shoulder closures between Lansdowne Road and Benchmark Road. Fiber installation under permit.
Route 606 (Mudd Tavern Road) Eastbound
Monday – Friday, 9 a.m.-3:30 p.m. Single lane and shoulder closure for guardrail work near the I-95 southbound on-ramp.
Harrison Road
Monday – Friday, 9 a.m.-3 p.m. Road widening work between Gordon Road and Old Plank Road. Flaggers will alternate one-way traffic through the work zone.
Bridge Washing: Multiple Locations
Sunday – Saturday, 7 p.m.-7 a.m. Bridge washing. Mobile operation with alternating lane closures at multiple locations:
Route 208 (Courthouse Road) over Lake Anna
Route 612 over Lake Anna
Route 719 over Lake Anna
Stafford County
Route 17
Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Sanford Drive/South Gateway Drive and Falls Run Drive. Median improvements under permit.
Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Poplar Road and Hartwood Church Road. Median improvements under permit.
Monday – Friday, 9 a.m.-3 p.m. Alternating northbound and southbound lane closures on Route 17 between Hartwood Church Road and the Fauquier County line. Fiber installation under permit.
Route 218 (Butler Road)
Monday – Thursday, 8 p.m.-5 a.m. Single lane closures and shoulder closures between Cool Springs Road and Route 1. Fiber installation under permit.
Route 614 (Telegraph Road)
Sunday – Thursday, 8 p.m.-6 a.m. Mobile lane closures for milling and paving between the northern and southern intersections with Route 1.
Route 628 (Winding Creek Road) Eastbound
Monday – Friday, 9 a.m.-3:30 p.m. Alternating one-way traffic with flagging for guardrail work near the intersection of Route 709 (Walpole Street).
Route 652
Thursday – Friday, 8 a.m.-5 p.m. Alternating lane closures with flagging a pilot truck to guide traffic through the work zone for pavement marking work between Truslow Road and Summer Breeze Lane.
Parkway Boulevard
Monday – Friday, 9 a.m.-3 p.m. Mobile single lane closures for new pavement marking installation between Route 610 (Garrisonville Road) and Route 709 (Flatford Road). Read the release.
Bridge Washing: Multiple Locations
Sunday – Saturday, 7 p.m.-7 a.m. Bridge washing. Mobile operation with alternating lane closures at multiple locations:
Route 1 over Rappahannock River
Route 3 over Rappahannock River
Route 651 over Potomac Run
Signal Work
Monday – Friday, 9 a.m.-3:30 p.m. Flagging operation at the following intersections for signal work:
Route 624 (Primmer House Road) and Route 1960 (Riggs Road)/Route 2441 (Switchyard Court)
Route 1706 (Plantation Drive) and South of Smokehouse Drive
Route 2350 (Woodcutters Road) and Route 2351 (Millrace Road)
Westmoreland County
Route 3 (Kings Highway)
Wednesday – Friday, 7 a.m.-7 p.m. Mobile lane closures to refresh pavement markings between Route 624 (Flat Iron Road) and Route 623 (Finches Hill Road).
Bridge Washing: Multiple Locations
Sunday – Saturday, 7 p.m.-7 a.m. Bridge washing. Mobile operation with alternating lane closures at multiple locations:
Route 202 over Nomini Creek
Route 608 over Kinsale Creek
Additional Projects in Fredericksburg District
Caroline County
Route 207 Northbound Bridge Rehabilitation
Construction is underway to improve the northbound Route 207 (Rogers Clark Boulevard) bridge over the Mattaponi River. The project will replace steel plate girders, concrete deck, railing, bridge approaches, and make substructure repairs. Northbound Route 207 traffic is diverted to cross the Mattaponi River using the Route 207 southbound bridge, with one travel lane open in each direction. During the closure, Route 207 northbound will remain closed until the completion of the project. Work is expected to be complete in April 2026.
City of Fredericksburg
Route 1 at Fall Hill Avenue, and
Route 1 at Princess Anne Street and Hanson Avenue
Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Construction will be complete by June 2026. Intermittent single lane and shoulder closures will be needed at times, but most lane closures will occur overnight, and outside of peak weekday commute times.
Spotsylvania County
I-95 Exit 126 Area Improvements
Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion in Sept. 2027.
Route 620 (Harrison Road) Reconstruction and Widening
Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion in late summer 2026.
Stafford County
Route 1 at Telegraph Road and Woodstock Lane
Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left turn lanes will be built from Telegraph Road onto Route 1 southbound. A left turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion in fall 2026. Visit the county project page.
Route 1 and Courthouse Road Intersection Improvement Project
Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion in summer 2027. Visit the county project page.
Commuting and Ridesharing Information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.



















