Interstate 95 Northbound
Exit 110 (Ladysmith) to Exit 118 (Thornburg)
Monday – Thursday, 9 p.m.-5 a.m. Alternating lane closures at mile marker 117. Bridge maintenance at the Matta River.
Exit 118 (Thornburg) to Exit 126 (Spotsylvania)
Monday – Thursday, 9 p.m.-4:30 a.m. Alternating lane closures between mile markers 121-126 for milling and paving mobile operation.
Caroline County
Secondary Road Resurfacing
Monday – Friday, 8 a.m.-5 p.m. Road resurfacing. A flagging crew will direct one-way, alternating traffic along the following routes:
Route 601 (Edgar Road)
Route 646 (Fork Bridge Road)
Route 651 (Old Dawn Road)
Route 654 (Kidds Fork Road)
Route 674 (Burnetts Road)
Route 677 (Camp Road)
Route 694 (Courtney Road)
Route 718 (Allport Lane)
Route 760 (Sorrell Lane)
Route 777 (Jennings Drive)
City of Fredericksburg
Fall Hill Avenue
Monday, noon-3 p.m., and Tuesday – Friday, 9 a.m.-3 p.m. Alternating lane closures between Route 1 and Bridgewater Street. Flaggers will direct traffic through the work zone. Construction for intersection improvement project.
Spotsylvania County
Route 1
Monday – Thursday, 8 p.m.-6 a.m. Mobile operation with alternating lane closures on Route 1 northbound and southbound between the Ni River bridge and Filter Lane for milling and paving.
Route 1 Southbound
Monday, noon-3:30 p.m., and Tuesday – Friday, 9 a.m.-3:30 p.m. Right lane closure near North Roxbury Mill Road for guardrail repair.
Route 3 (Plank Road) Westbound
Wednesday – Thursday, 8 p.m.-6 a.m. Alternating lane closures for milling between Elys Ford Road and Wilderness Road, ahead of upcoming paving.
Route 3 (Plank Road)
Tuesday – Friday, 9 a.m.-3 p.m. Alternating lane closures for traffic signal work at the following intersections:
Gordon Road
Old Plank Road/Five Mile Road
Single Oak Road/Chancellor Village Road
Chancellor Center/Salem Church Crossing
Route 3 (Plank Road)
Monday, noon-3:30 p.m., and Tuesday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures for guardrail installation.
Route 17 (Mills Drive) Southbound
Monday, noon-3:30 p.m., and Tuesday – Friday, 9 a.m.-3:30 p.m. Right lane closure near Massaponax Church Road for guardrail repair.
Route 601 (Arritt Road)
Monday, noon-7 p.m., and Tuesday – Friday, 9 a.m.-7 p.m. Alternating single lane closures between Spotsylvania County and Louisa County line and Route 622 (Fairview Road) for paving and pavement marking work. Flaggers will direct traffic.
Route 620 (Harrison Road)
Tuesday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Gordon Road and Old Plank Road for road widening construction.
Route 620 (Spotswood Furnace Road)
Monday, noon-3:30 p.m., and Tuesday – Friday, 9 a.m.-3:30 p.m. Guardrail installation, about 1.5 miles west of US Ford Road intersection.
Tuesday – Friday, 9 a.m.-7 p.m. Alternating lane closures for milling between River Road and Mills Road, before an upcoming full-depth pavement rehabilitation project.
Route 639 (Leavells Road)
Tuesday – Friday, 9 a.m.-3 p.m. Alternating lane closures, directed by a flagging crew. Installation of a Rectangular Rapid Flashing Beacon at Breezewood Drive.
Route 690 (Peppertree Lane)
Wednesday – Friday, 8 a.m.-5 p.m. Road resurfacing between Herndon Road and the cul-de-sac. One-way, alternating traffic.
Route 711 (Southpoint Parkway)
Monday – Thursday, 9 p.m.-5 a.m. Alternating single lane closures for bridge repairs.
Route 1196 (Stansbury Drive)
Tuesday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic near Gordon Road intersection for road widening construction.
Rivers Bluff subdivision
Monday – Friday, 8 a.m.-5 p.m. Road resurfacing on multiple routes in the subdivision. One-way, alternating traffic.
Spotsylvania Parkway
Tuesday – Friday 9 a.m.-3 p.m. Alternating lane closures between the Deep Creek Drive/Holley Oak Lane and New Berne Road/Yellow Birch Drive intersections. Installation of a Rectangular Rapid Flashing Beacon.
Stonemill subdivision
Monday – Friday, 9 a.m.-7 p.m. Application of shoulder stone along multiple routes in the subdivision. One-way, alternating traffic.
Sunset Harbor subdivision
Monday – Friday, 8 a.m.-5 p.m. Road resurfacing on multiple routes in the subdivision. One-way, alternating traffic.
Three Cedars subdivision
Monday – Friday, 9 a.m.-7 p.m. Application of shoulder stone along multiple routes in the subdivision. One-way, alternating traffic.
Stafford County
Route 3 (Kings Highway) Westbound
Monday, noon-3:30 p.m. and Tuesday – Friday, 9 a.m.-3:30 p.m. Left lane closure near Route 3 business flyover bridge for guardrail repair.
Stefangia Road
Monday – Thursday, 9 a.m.-7 p.m. Pavement marking work between Poplar Road and Mountain View Road. Flaggers will alternate one-way traffic through the work zone.
Country Wood Estates subdivision
Monday – Friday, 9 a.m.-7 p.m. Road resurfacing on multiple routes in the subdivision. One-way, alternating traffic.
Additional Projects in Fredericksburg District
Caroline County
Route 638 (South River Road) Bridge Replacement
Construction is underway to replace the Route 638 (South River Road) bridge over South River. A portion of South River Road is closed with a detour in place. The project will be complete by Sept. 2025.
City of Fredericksburg
Route 1 at Fall Hill Avenue, and
Route 1 at Princess Anne Street and Hanson Avenue
Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Construction will be complete by June 2026. Intermittent single lane and shoulder closures will be needed at times, but most lane closures will occur overnight, and outside of peak weekday commute times.
Lafayette Boulevard at Twin Lakes/Kensington
Construction is underway on a $2.4 million bicycle and pedestrian connector project. Most construction will occur on the road shoulders and outside of the travel lanes. The project will be complete by Nov. 2025.
Essex County
Route 607 (Cheaneys Bridge Road) over Dragon Run Creek
Cheaneys Bridge Road over Dragon Run Creek is closed to through traffic for a bridge replacement project. The road will remain closed until the new bridge opens in May 2026. Motorists should follow the posted detour, which is approximately 6 miles.
Spotsylvania County
I-95 Exit 126 Area Improvements
Route 1 is being widened to six lanes near the exit 126 interchange. This will provide space to build a second left turn lane for traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion in Sept. 2027.
I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound
Two lanes are now open on the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound was widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is open from Route 1 southbound to Southpoint Parkway. Traffic islands are installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic exiting from side streets. Project completion in August 2025.
Route 606 (Mudd Tavern Road) Widening
Four travel lanes are now open on Mudd Tavern Road between I-95 and Route 1. A new secondary access route, Route 2092, remains under construction parallel to Mudd Tavern Road and will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion was scheduled for late May 2025, but construction will continue in July 2025. Updates will be posted to the project page.
Route 620 (Harrison Road) Reconstruction and Widening
Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion in late summer 2026.
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.