Interstate 95 Northbound and Southbound
Exit 118 (Thornburg) to Exit 126 (Spotsylvania)
Monday – Thursday, 9 p.m.- 5 a.m. Single lane closures at various bridges between the interchanges for routine safety inspection at the following locations:
• Bridges over the Matta River at mile marker 117
• Massaponax Church Road overpass at mile marker 123-124
• Spotsylvania Parkway overpass at mile marker 124-125
Exit 130 (Route 3)
Monday – Friday, 9 p.m.- 5 a.m. Single lane and shoulder closures to allow crews to inspect the Cowan Boulevard overpass at mile marker 131.
Interstate 95 Northbound
Exit 126 (Spotsylvania) – Exit 130 (Route 3)
Sunday – Monday, 10 p.m. – 5 a.m. and Monday – Thursday, 9 p.m.- 4:30 a.m. Alternating lane closures between mile markers 125-128 for milling and paving mobile operation with police directing traffic.
Exit 140 (Courthouse Road) to Exit 143 (Aquia/Garrisonville)
Sunday – Thursday, 9 p.m.- 4:30 a.m. Alternating lane closures between mile markers 140 – 142 for paving operation.
Exit 143 (Aquia/Garrisonville) to Exit 148 (Quantico)
Sunday – Thursday, 9 p.m.- 4:30 a.m. Alternating lane closures between mile markers 146-148 for paving operation.
Interstate 95 Southbound
Exit 130 (Route 3) to Exit 126 (Spotsylvania)
Sunday – Monday, 10 p.m. – 5 a.m. Alternating lane closures between mile markers 128 – 125 for paving operation.
Exit 140 (Courthound Road) to Exit 136 (Centreport Parkway)
Monday – Thursday, 9 p.m.-4:30 a.m. Alternating lane closures at mile marker 139-136 for milling and paving operation with police directing traffic.
Caroline County
Route 2
Monday – Friday, 8 a.m.-7 p.m. One-way, alternating traffic between Route 207 (Rogers Clark Boulevard) and the Spotsylvania County line. Milling and paving.
Route 207 (Rogers Clark Boulevard)
24/7. Single lane closures on Route 207 near the bridges over the Mattaponi River with work to rehabilitate the northbound bridge underway. Work zone is between Nelson Hill Road and Colonial Road. Speed limit has been reduced to 45 mph.
Route 301
Monday – Friday, 8 a.m.-7 p.m. Alternating lane closures for milling and paving between Route 17 and south end of the Rappahannock River bridge.
City of Fredericksburg
Route 1 Southbound
Sunday – Friday, 9 p.m.-5 a.m. Right lane closure between Charles Street and Fall Hill Avenue. Construction for intersection improvement project.
Route 2 (Dixon Street)
Monday – Thursday, 9 p.m.- 6 a.m. Single lane closure on Route 2 between Beulah Salisbury Drive and Church Street for geotechnical work for a future construction project.
Fall Hill Avenue
Monday – Friday, 9 a.m.-3 p.m. Right turn lane closure at the Route 1 intersection. Construction for intersection improvement project.
Spotsylvania County
Route 3 (Plank Road) Westbound
Sunday – Tuesday, 8 p.m.-6 a.m. Alternating lane closures for pavement marking work between Elys Ford Road and Wilderness Road.
Route 3 (Plank Road)
Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures for traffic signal work at Chancellor Center/Salem Church Crossing and Gordon Road/Chancellor Road.
Route 208 (Courthouse Road)
Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures for traffic signal work at Brittany Commons Boulevard and Breckenridge Drive.
Route 610 (Old Plank Road)
Wednesday – Friday, 9 a.m.-3 p.m. One-way alternating lane closures with flagging operation between Harrison Road and Gordon Road for road widening project.
Route 620 (Harrison Road)
Monday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic between Old Plank Road and Gordon Road for road widening project.
Tuesday – Thursday, 9 p.m. – 5 a.m. Full closure and detour. Harrison Road will close to through traffic overnight. All through traffic on Harrison Road will be detoured to use Gordon Road and Old Plank Road.
Route 627 (Gordon Road)
Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures for signal work at Route 674 (Chancellor Road).
Route 1741 (East and West River Bend Road)
Monday – Friday, 9 a.m.-5 p.m. One-way, alternating traffic. Pavement marking.
Route 2162 (Cedar Hill Drive)
Monday – Friday, 9 a.m.-5 p.m. One-way, alternating traffic. Pavement marking.
Route 2175 (Aurora Lane)
Monday – Friday, 9 a.m.-5 p.m. One-way, alternating traffic. Pavement marking.
Route 2176 (Horizon View Court)
Monday – Friday, 9 a.m.-5 p.m. One-way, alternating traffic. Pavement marking.
Eagle Drive
Thursday – Friday, 9 a.m.-7 p.m. Pavement marking work between Route 17 and Lee Hill School Drive. One-way, alternating traffic.
Lee Hill School Drive
Monday – Friday, 9 a.m.-7 p.m. Pavement marking work between Germanna Point Drive and Old Dominion Parkway then Old Dominion Parkway and Eagle Drive. One-way, alternating traffic.
Old Dominion Parkway
Wednesday – Friday, 9 a.m.-7 p.m. Pavement marking work between Route 17 and Lee Hill School Drive. One-way, alternating traffic.
Stafford County
Route 1 Southbound
Sunday – Thursday, 9 p.m.- 4 a.m. Left lane closure to repair guardrail near Twin Brook Lane and Carnaby Street.
Route 17 Business
Monday – Friday, 9 a.m.-3 p.m. Alternating lane closures on Route 17 between Lendall Lane and Solomon Drive for traffic signal work.
Route 601 (Hollywood Farm Road)
Monday – Friday, 9 a.m.-5 p.m. Pavement marking work between Caisson Road and Route 3 (Kings Highway). Flaggers will alternate one-way traffic through the work zone.
Route 624 (Barrett Heights Road)
Sunday – Thursday, 8 p.m.- 6 a.m. Alternating lane closures with flagging for milling and paving between Garrisonville Road and Onville Road.
Route 641 (Onville Road)
Sunday – Thursday, 8 p.m.- 6 a.m. Alternating lane closures with flagging for milling and paving between Aquia Creek bridge and Garrisonville Road.
Route 2176 (Stableside Lane)
Monday – Friday, 9 a.m.-5 p.m. Application of pavement markings between Hollywood Farm Road and Gateway Drive. One-way, alternating traffic.
Affirmed Drive
Monday – Wednesday, 7:30 a.m.- 5 p.m. Alternating lane closures with flagging for paving.
Greenspring Drive
Monday – Friday, 9 a.m.-7 p.m. Alternating lane closures with flagging for milling and paving between end of state maintenance and Route 684 (Mine Road).
Salisbury Drive
Monday – Friday, 9 a.m.-7 p.m. Alternating lane closures with flagging for milling and paving between Route 679 (Greenspring Drive) and Route 610 (Garrisonville Road).
Town of Tappahannock
Downing Bridge (Route 360 over the Rapphannock River)
Sunday – Thursday, 8 p.m.- 5 a.m. Bridge maintenance. Route 360 between Richmond County and the Town of Tappahannock will be reduced to a single lane overnight.
Westmoreland County
Bridge Washing
Monday – Saturday, 7 p.m. – 6 a.m. Mobile operation for bridge washing at the following locations:
• Route 3 over Chandlers Mill Pond
• Route 3 over Popes Creek
• Route 3 over Mattox Creek
• Route 205 over Rosier Creek
• Route 205 over Branch of Rosier Creek
• Route 608 over Kinsale Creek
• Route 621 over Tidewell’s Marsh
• Route 639 over Popes Creek
• Route 642 over Big Swamp
Additional Projects in Fredericksburg District
Caroline County
Route 207 Northbound Bridge Rehabilitation
Construction is underway to improve the northbound Route 207 (Rogers Clark Boulevard) bridge over the Mattaponi River. The project will replace steel plate girders, concrete deck, railing, bridge approaches, and make substructure repairs. Work is expected to be complete in April 2026.
City of Fredericksburg
Route 1 at Fall Hill Avenue, and
Route 1 at Princess Anne Street and Hanson Avenue
Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Construction will be complete by June 2026. Intermittent single lane and shoulder closures will be needed at times, but most lane closures will occur overnight, and outside of peak weekday commute times.
Spotsylvania County
I-95 Exit 126 Area Improvements
Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion in Sept. 2027.
Route 606 (Mudd Tavern Road) Widening
Four travel lanes are now open on Mudd Tavern Road between I-95 and Route 1. A new secondary access route, Route 2092, remains under construction parallel to Mudd Tavern Road and will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion was scheduled for late May 2025, but final construction activities continue. Updates will be posted to the project page.
Route 620 (Harrison Road) Reconstruction and Widening
Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion in late summer 2026.
Commuting and Ridesharing Information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.